This page is an unofficial LFoD record and is not legal advice. Verify the document against the official source before relying on it.
HB339: establishing a committee to study the use of certain state-owned property along the Baker River.
Bill details
Version history, amendments, and roll-call votes were not present in the imported local bill data.
Sponsors
- John Alger House ยท Graf 14
Topics
Environment and natural resources Housing and property
Official links
HB 339 - AS INTRODUCED
2003 SESSION
03-0207
06/09
HOUSE BILL 339
AN ACT establishing a committee to study the use of certain state-owned property along the Baker River.
ANALYSIS
This bill establishes a committee to study the use of certain state-owned property along the Baker River.
- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -
Explanation: Matter added to current law appears in bold italics.
Matter removed from current law appears [in brackets and struckthrough.]
Matter which is either (a) all new or (b) repealed and reenacted appears in regular type.
03-0207
06/09
STATE OF NEW HAMPSHIRE
In the Year of Our Lord Two Thousand Three
AN ACT establishing a committee to study the use of certain state-owned property along the Baker River.
Be it Enacted by the Senate and House of Representatives in General Court convened:
1 Committee Established. There is established a committee to study the need for an additional flood control and recreational use dam and lake known as the "Baker River watershed multiple-use project site-7 south branch" of the Baker River in Wentworth.
2 Membership and Compensation.
I. The members of the committee shall be as follows:
(a) Four members of the house of representatives, appointed by the speaker of the house.
(b) Three members of the senate, appointed by the president of the senate.
II. Members of the committee shall receive mileage at the legislative rate when attending to the duties of the committee.
3 Duties. The committee shall examine the need for a flood control and recreational dam and lake, known as the "Baker River Watershed Multiple Use Project Site 7" on the South Branch of the Baker River in Wentworth and shall examine the options for management of certain state-owned property along the Baker River that has been acquired for the project.
4 Chairperson; Quorum. The members of the study committee shall elect a chairperson from among the members. The first meeting of the committee shall be called by the first-named house member. The first meeting of the committee shall be held within 45 days of the effective date of this section. Three members of the committee shall constitute a quorum.
5 Report. The committee shall report its findings and any recommendations for proposed legislation to the speaker of the house of representatives, the senate president, the house clerk, the senate clerk, the governor, and the state library on or before November 1, 2003.
6 Effective Date. This act shall take effect upon its passage.