This page is an unofficial LFoD record and is not legal advice. Verify the document against the official source before relying on it.
HB1257: changing requirements for extensions of time for hearings by pretrial screening panels for medical injury claims.
Bill details
Version history, amendments, and roll-call votes were not present in the imported local bill data.
Sponsors
- David Nixon House · Hills 17
- Rowe House · Hills 6
- Anthony DiFruscia House · Rock 4
- James Craig House · Hills 9
Topics
Criminal justice and courts Health care
Official links
HB 1257 – AS AMENDED BY THE HOUSE
03Mar2010… 0769h
2010 SESSION
10-2253
09/04
HOUSE BILL 1257
AN ACT changing requirements for extensions of time for hearings by pretrial screening panels for medical injury claims.
ANALYSIS
This bill changes requirements for extensions of time for hearings by pretrial screening panels for medical injury claims.
- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -
Explanation: Matter added to current law appears in bold italics.
Matter removed from current law appears [in brackets and struckthrough.]
Matter which is either (a) all new or (b) repealed and reenacted appears in regular type.
03Mar2010… 0769h
10-2253
09/04
STATE OF NEW HAMPSHIRE
In the Year of Our Lord Two Thousand Ten
AN ACT changing requirements for extensions of time for hearings by pretrial screening panels for medical injury claims.
Be it Enacted by the Senate and House of Representatives in General Court convened:
1 Panel Procedures; Extensions of Time. Amend RSA 519-B:4, VI to read as follows:
VI. All requests for extensions of time under this section shall be made to the panel chairperson. [The chairperson may extend any time period for good cause, except that the chairperson may not extend any time period that would result in the hearing being held more than 11 months following the return date unless good cause is shown.] If the hearing is not held within 11 months of the return date, the hearing shall be considered waived and the panel shall be dismissed, unless the parties agree otherwise or the delay was caused by the plaintiff without just cause.
2 Effective Date. This act shall take effect January 1, 2011.