This page is an unofficial LFoD record and is not legal advice. Verify the document against the official source before relying on it.

HB1472: relative to the siting of certain new pipelines and storage vessels.

Bill details

Version history, amendments, and roll-call votes were not present in the imported local bill data.

Sponsors

Topics

Science, Technology and Energy

Official links

HB 1472 - AS INTRODUCED

2016 SESSION

16-2545

06/05

HOUSE BILL 1472

AN ACT relative to the siting of certain new pipelines and storage vessels.


ANALYSIS

This bill requires new construction of certain underground pipelines and storage tanks to be below the frost line.

- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -

Explanation: Matter added to current law appears in bold italics.

Matter removed from current law appears [in brackets and struckthrough.]

Matter which is either (a) all new or (b) repealed and reenacted appears in regular type.

16-2545

06/05

STATE OF NEW HAMPSHIRE

In the Year of Our Lord Two Thousand Sixteen

AN ACT relative to the siting of certain new pipelines and storage vessels.

Be it Enacted by the Senate and House of Representatives in General Court convened:

1 New Section; New Construction of Underground Pipelines and Storage Tanks. Amend RSA 162-H by inserting after section 10-b the following new section:

162-H:10-c New Construction of Underground Pipelines and Storage Tanks. After the effective date of this section, any certificate issued for underground construction of a pipeline or tank that is used for the commercial transmission, distribution, or storage of explosive, flammable, contaminate, or hazardous gasses or liquids shall require such construction to be below the frost line.

2 Effective Date. This act shall take effect 60 days after its passage.