This page is an unofficial LFoD record and is not legal advice. Verify the document against the official source before relying on it.
HB502: relative to petitions for verification of checklists.
Bill details
Version history, amendments, and roll-call votes were not present in the imported local bill data.
Sponsors
- Catherine Cheney
- Jordan Ulery
- Valerie Fraser
- James Grenier
- David Boutin
- John Mullen
- Laura Jones
- Barbara Griffin
- Herbert Vadney
Topics
Official links
HB 502 - AS INTRODUCED
2015 SESSION
15-0629
03/10
HOUSE BILL 502
AN ACT relative to petitions for verification of checklists.
ANALYSIS
This bill lengthens the time period during which voters may petition for verification of checklists.
- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -
Explanation: Matter added to current law appears in bold italics.
Matter removed from current law appears [in brackets and struckthrough.]
Matter which is either (a) all new or (b) repealed and reenacted appears in regular type.
15-0629
03/10
STATE OF NEW HAMPSHIRE
In the Year of Our Lord Two Thousand Fifteen
AN ACT relative to petitions for verification of checklists.
Be it Enacted by the Senate and House of Representatives in General Court convened:
1 Verification of Checklist; Petition Deadline. Amend the introductory paragraph of RSA 654:38 to read as follows:
654:38 Verification of Checklists. On petition of 50 registered voters or 5 percent of the registered voters in any town or ward, whichever is less, or on petition of a majority of the board of supervisors of the checklist filed with the secretary of state no later than the [fifth] eighth Friday after a state election, the ballot law commission shall conduct an investigation to determine whether or not there should be a revision and verification of the checklist of said town or ward. At least one public hearing duly advertised in a newspaper of general circulation in said town or city shall be held by the commission at such time and place it may determine. In the event of an affirmative decision, the commission shall direct the supervisors to revise and verify such checklist. Thereupon the supervisors shall revise and verify such checklist in the following manner:
2 Effective Date. This act shall take effect 60 days after its passage.