This RSA section is an unofficial mirror, is not legal advice, and may be incomplete, outdated, or incorrectly processed.

RSA 155-E:8 · Issuance of Permit

155-E:8 Issuance of Permit. – If the regulator after the public hearing approves the application for a permit and determines it is not prohibited by RSA 155-E:4 it shall, upon receipt of an excavation fee determined by the regulator not to exceed $50 and the posting of a bond or other such surety with the municipal treasurer in an amount, as it requires, reasonably sufficient to guarantee compliance with the permit, grant a permit to the applicant for an excavation. A copy of the permit shall be prominently posted at the excavation site or the principal access thereto. A permit shall not be assignable or transferable without the prior written consent of the regulator. A permit shall specify the date upon which it expires. The regulator may include in a permit such reasonable conditions as are consistent with the purpose of this chapter and may include requirements for a permit for excavation which are more stringent than the standards set forth in this chapter including the provision of visual barriers to the excavation. Source. 1979, 481:2. 1991, 310:22, eff. Aug. 23, 1991.

Copy link

Source note

Source. 1979, 481:2. 1991, 310:22, eff. Aug. 23, 1991.

Source history

  • 1979, 481:2
  • 1991, 310:22, eff. Aug. 23, 1991

Related materials

Bill relationships

  • 2026 HB1029 reference

    activities performed with mechanized equipment that are intended to cut vegetation, including lawn edging, aeration, and de-thatching, excavations permitted or grandfathered under RSA 155-E, or replacement of department-of-transportation-installed delineator posts in the same location. 2 Effective Date. This act shall take effect 60 days after its passage. LBA 26-2465 Revised 12/5/25 HB 1029-FN-

  • 2026 HB1029-FN reference

    activities performed with mechanized equipment that are intended to cut vegetation, including lawn edging, aeration, and de-thatching, excavations permitted or grandfathered under RSA 155-E, or replacement of department-of-transportation-installed delineator posts in the same location. 2 Effective Date. This act shall take effect 60 days after its passage. LBA 26-2465 Revised 12/5/25 HB 1029-FN-

  • 2026 HB1141 amend

    to this chapter: I. Mining activities in existence before August 24, 1979. II. The crushing of rock for the purpose of producing construction aggregate regulated pursuant to RSA 155-E. 4 New Paragraphs; Definitions; Reclamation; Rock; Septage. Amend RSA 485-A:2 by inserting after paragraph IX-a the following new paragraphs: IX-b. “Reclamation” means the restoration of the affected site by gr

  • 2026 HB1141-FN amend

    to this chapter: I. Mining activities in existence before August 24, 1979. II. The crushing of rock for the purpose of producing construction aggregate regulated pursuant to RSA 155-E. 4 New Paragraphs; Definitions; Reclamation; Rock; Septage. Amend RSA 485-A:2 by inserting after paragraph IX-a the following new paragraphs: IX-b. “Reclamation” means the restoration of the affected site by gr

Opinions and discipline decisions mentioning this RSA