This RSA section is an unofficial mirror, is not legal advice, and may be incomplete, outdated, or incorrectly processed.
RSA 362-A:4 · Payment by Public Utilities for Purchase of Output
362-A:4 Payment by Public Utilities for Purchase of Output. – Public utilities purchasing electrical energy in accordance with the provisions of this chapter shall pay rates per kilowatt hour to be set from time to time by the commission. Such rates shall be based on the purchasing utility's avoided costs. The commission may set long term rates which shall, at the option of the qualifying small power producer or qualifying cogenerator, be based on the purchasing utility's avoided costs either calculated for the time of delivery or calculated for a specified term at the time the qualifying small power producer or qualifying cogenerator agrees to be obligated to deliver for the specified term. Nothing in this section shall limit the authority of any electric utility or any qualifying small power producer or qualifying cogenerator to agree to a rate for any purchase which differs from the rate or terms or conditions which would otherwise be required by the commission. No payments or rates shall be required by this section in locations where retail electric competition is certified to exist pursuant to RSA 38:36, unless such payments or rates are pursuant to an arrangement authorized by RSA 362-A:3. Source. 1978, 32:1. 1983, 395:4. 1998, 261:7, eff. Aug. 25, 1998.
Copy linkSource note
Source. 1978, 32:1. 1983, 395:4. 1998, 261:7, eff. Aug. 25, 1998.
Source history
- 1978, 32:1
- 1983, 395:4
- 1998, 261:7, eff. Aug. 25, 1998
Related materials
Bill relationships
-
2026 HB1741
amend · effective 2027-01-01
ratepayer savings. VII. Statutory and regulatory support is needed to overcome barriers to DPP deployment and integration. 2 New Subdivision; Distributed Power Plants. Amend RSA 362-A by inserting after section 9 the following new subdivision: Distributed Power Plants 362-A:10 Definitions. In this subdivision: I. “Aggregator” means a third-party entity that enrolls customers in a distributed po
-
2026 HB1741-FN
amend · effective 2027-01-01
ratepayer savings. VII. Statutory and regulatory support is needed to overcome barriers to DPP deployment and integration. 2 New Subdivision; Distributed Power Plants. Amend RSA 362-A by inserting after section 9 the following new subdivision: Distributed Power Plants 362-A:10 Definitions. In this subdivision: I. “Aggregator” means a third-party entity that enrolls customers in a distributed po
-
2026 HB219
reference · effective 2027-07-01
ity or a class I source of useful thermal energy. An electrical generating facility, while selling its electrical output at long-term rates established before January 1, 2007, by orders of the commission under RSA 362-A:4, shall not be considered a renewable source. 6 Renewable Energy Fund. Amend RSA 362-F:10, I to read as follows: I. There is hereby established a renewable energy fund. This nonlapsing special fund shall be con
-
2026 HB219-FN
amend · effective 2027-07-01
ul thermal energy. An electrical generating facility, while selling its electrical output at long-term rates established before January 1, 2007, by orders of the commission under RSA 362-A:4, shall not be considered a renewable source. 6 Renewable Energy Fund. Amend RSA 362-F:10, I to read as follows: I. There is hereby established a renewable energy fund. This nonlapsing special fund shall be continu
-
2026 SB540
amend · effective 2027-01-01
o a building’s electrical system through a receptacle or other non-permanent wiring connection. 2 New Section; Plug-In Solar Generation Systems; Exemptions; Requirements. Amend RSA 362-A by inserting after section 9 the following new section: 362-A:10 Plug-in Solar Generation Systems; Exemptions; Requirements. I. Plug-in solar generation systems shall be certified by a nationally recognized testing l
-
2026 SB540-FN
amend · effective 2027-01-01
o a building’s electrical system through a receptacle or other non-permanent wiring connection. 2 New Section; Plug-In Solar Generation Systems; Exemptions; Requirements. Amend RSA 362-A by inserting after section 9 the following new section: 362-A:10 Plug-in Solar Generation Systems; Exemptions; Requirements. I. Plug-in solar generation systems shall be certified by a nationally recognized testing l