RSA 374:31 · Leases, Etc., When Void
374:31 Leases, Etc., When Void. – If commission approval is required pursuant to RSA 374:30 for any transfer, lease, or contract, any such attempted transfer, lease, or contract shall be void unless the same shall have been approved by the commission. Source. 1911, 164:13. 1913, 145:13. PL 240:29. RL 289:29. 2012, 177:13, eff. Aug. 10, 2012.
Copy linkSource note
Source. 1911, 164:13. 1913, 145:13. PL 240:29. RL 289:29. 2012, 177:13, eff. Aug. 10, 2012.
Source history
- 1911, 164:13
- 1913, 145:13. PL 240:29. RL 289:29
- 2012, 177:13, eff. Aug. 10, 2012
Related materials
Bill relationships
-
2026 HB1743
amend
mart meters. Be it Enacted by the Senate and House of Representatives in General Court convened: 1 New Section; Public Utilities; Smart Meter Radiation Disclosure. Amend RSA 374 by inserting after section 2-a the following new section: 374:2-b Smart Meter Radiation Disclosure. I. Each electric utility operating in the state shall provide an annual written statement to each utility account h
-
2026 HB1743-FN
amend
mart meters. Be it Enacted by the Senate and House of Representatives in General Court convened: 1 New Section; Public Utilities; Smart Meter Radiation Disclosure. Amend RSA 374 by inserting after section 2-a the following new section: 374:2-b Smart Meter Radiation Disclosure. I. Each electric utility operating in the state shall provide an annual written statement to each utility account h
-
2026 HB1745
amend · effective 2027-01-01
ity costs to ratepayers. Be it Enacted by the Senate and House of Representatives in General Court convened: 1 New Section; Prohibited Cost Recovery Through Rates. Amend RSA 374 by inserting after section 2-a the following new section: 374:2-b Prohibited Cost Recovery Through Rates. I. No public utility shall recover through rates any costs associated with its attendance at, participation i
-
2026 HB1745-FN
amend · effective 2027-01-01
ity costs to ratepayers. Be it Enacted by the Senate and House of Representatives in General Court convened: 1 New Section; Prohibited Cost Recovery Through Rates. Amend RSA 374 by inserting after section 2-a the following new section: 374:2-b Prohibited Cost Recovery Through Rates. I. No public utility shall recover through rates any costs associated with its attendance at, participation i
-
2026 SB540
amend · effective 2027-01-01
Each plug-in solar generation system shall be installed and operated in accordance with the state building code and manufacturer instructions. 4 New Section; Liability. Amend RSA 374 by inserting after section 1-a the following new section: 374:1-b Liability for Plug-In Solar Generation Systems. An electric distribution utility shall not be liable for damage, injury, or compensation or charges ari
-
2026 SB540-FN
amend · effective 2027-01-01
Each plug-in solar generation system shall be installed and operated in accordance with the state building code and manufacturer instructions. 4 New Section; Liability. Amend RSA 374 by inserting after section 1-a the following new section: 374:1-b Liability for Plug-In Solar Generation Systems. An electric distribution utility shall not be liable for damage, injury, or compensation or charges ari