This RSA section is an unofficial mirror, is not legal advice, and may be incomplete, outdated, or incorrectly processed.

RSA 374:34-b · [RSA 374:34-b repealed by 2023, 138:2, effective July 1, 2029.] 374:34-b Utility Pole Stakeholder's Group

[RSA 374:34-b repealed by 2023, 138:2, effective July 1, 2029.] 374:34-b Utility Pole Stakeholder's Group – There is established in the department of energy a stakeholder's group to address utility poles and attachments in the state. The stakeholder's group shall be under the direction of the director of the division of enforcement.

Copy link
I.

The stakeholder's group shall consist of:

Copy link
(a)

The chairperson of the public utilities commission, or designee.

Copy link
(b)

The commissioner of the department of transportation, or designee.

Copy link
(c)

The following members appointed by the governor:

Copy link
(1)

One member nominated by the New Hampshire Municipal Association.

Copy link
(2)

Two members representing different companies owning poles in New Hampshire who are members of the New Hampshire Telephone Association (NHTA).

Copy link
(3)

One member from a New Hampshire electric cooperative.

Copy link
(4)

Two members from investor-owned New Hampshire electric utilities.

Copy link
(5)

One member each from a competitive telephone utility and a provider of cellular telephone service, which are currently attached to poles in New Hampshire.

Copy link
(6)

One member representing the New England Cable and Telecommunications Association, Inc. (NECTA).

Copy link
II.

Responsibilities of the stakeholder's group include:

Copy link
(a)

Increasing utilization, improving functionality of attachment management systems (e.g., NJUNS), and identifying solutions to resolve communication issues among all parties.

Copy link
(b)

Increasing participation in NJUNS, or another centralized system of information sharing.

Copy link
(c)

Exploring enhancements to attachment management systems (e.g. NJUNS) which result in greater efficiency and less delay.

Copy link
(d)

Continuing the focus on attachment identification and pole location information.

Copy link
(e)

Addressing specifically, PUC rules 1303,06, 1303.07 and 1303.12 regarding pole transfers.

Copy link
III.

The frequency of the meetings of the stakeholder's group shall be at the discretion of the director of the division of enforcement.

Copy link
IV.

On or before November 1 of each year, the department of energy shall report on the stakeholder's group to the president of the senate, the speaker of the house of representatives, and the chairs of the senate and house committees with jurisdiction over energy and utilities. Source. 2023, 138:1, eff. Aug. 29, 2023. Transmitting Electricity Out of the State

Copy link

Source note

Source. 2023, 138:1, eff. Aug. 29, 2023. Transmitting Electricity Out of the State

Source history

  • 2023, 138:1, eff. Aug. 29, 2023. Transmitting Electricity Out of the State

Related materials

Bill relationships

  • 2026 HB1743 amend

    mart meters. Be it Enacted by the Senate and House of Representatives in General Court convened: 1 New Section; Public Utilities; Smart Meter Radiation Disclosure. Amend RSA 374 by inserting after section 2-a the following new section: 374:2-b Smart Meter Radiation Disclosure. I. Each electric utility operating in the state shall provide an annual written statement to each utility account h

  • 2026 HB1743-FN amend

    mart meters. Be it Enacted by the Senate and House of Representatives in General Court convened: 1 New Section; Public Utilities; Smart Meter Radiation Disclosure. Amend RSA 374 by inserting after section 2-a the following new section: 374:2-b Smart Meter Radiation Disclosure. I. Each electric utility operating in the state shall provide an annual written statement to each utility account h

  • 2026 HB1745 amend · effective 2027-01-01

    ity costs to ratepayers. Be it Enacted by the Senate and House of Representatives in General Court convened: 1 New Section; Prohibited Cost Recovery Through Rates. Amend RSA 374 by inserting after section 2-a the following new section: 374:2-b Prohibited Cost Recovery Through Rates. I. No public utility shall recover through rates any costs associated with its attendance at, participation i

  • 2026 HB1745-FN amend · effective 2027-01-01

    ity costs to ratepayers. Be it Enacted by the Senate and House of Representatives in General Court convened: 1 New Section; Prohibited Cost Recovery Through Rates. Amend RSA 374 by inserting after section 2-a the following new section: 374:2-b Prohibited Cost Recovery Through Rates. I. No public utility shall recover through rates any costs associated with its attendance at, participation i

  • 2026 SB540 amend · effective 2027-01-01

    Each plug-in solar generation system shall be installed and operated in accordance with the state building code and manufacturer instructions. 4 New Section; Liability. Amend RSA 374 by inserting after section 1-a the following new section: 374:1-b Liability for Plug-In Solar Generation Systems. An electric distribution utility shall not be liable for damage, injury, or compensation or charges ari

  • 2026 SB540-FN amend · effective 2027-01-01

    Each plug-in solar generation system shall be installed and operated in accordance with the state building code and manufacturer instructions. 4 New Section; Liability. Amend RSA 374 by inserting after section 1-a the following new section: 374:1-b Liability for Plug-In Solar Generation Systems. An electric distribution utility shall not be liable for damage, injury, or compensation or charges ari