This RSA section is an unofficial mirror, is not legal advice, and may be incomplete, outdated, or incorrectly processed.
RSA 374:42 · Answer; Hearing
374:42 Answer; Hearing. – Upon the beginning of such suit, it shall be the duty of the court to specify the time, not exceeding 20 days after service of a copy of the petition, within which the defendant complained of must answer. In case of default in answer, or after answer, the court shall immediately make inquiry into the facts and circumstances without other or formal pleadings and without respect to any technical requirement. Source. 1911, 164:16. PL 240:40. RL 289:40.
Copy linkSource note
Source. 1911, 164:16. PL 240:40. RL 289:40.
Source history
- 1911, 164:16. PL 240:40. RL 289:40
Related materials
Bill relationships
-
2026 HB1743
amend
mart meters. Be it Enacted by the Senate and House of Representatives in General Court convened: 1 New Section; Public Utilities; Smart Meter Radiation Disclosure. Amend RSA 374 by inserting after section 2-a the following new section: 374:2-b Smart Meter Radiation Disclosure. I. Each electric utility operating in the state shall provide an annual written statement to each utility account h
-
2026 HB1743-FN
amend
mart meters. Be it Enacted by the Senate and House of Representatives in General Court convened: 1 New Section; Public Utilities; Smart Meter Radiation Disclosure. Amend RSA 374 by inserting after section 2-a the following new section: 374:2-b Smart Meter Radiation Disclosure. I. Each electric utility operating in the state shall provide an annual written statement to each utility account h
-
2026 HB1745
amend · effective 2027-01-01
ity costs to ratepayers. Be it Enacted by the Senate and House of Representatives in General Court convened: 1 New Section; Prohibited Cost Recovery Through Rates. Amend RSA 374 by inserting after section 2-a the following new section: 374:2-b Prohibited Cost Recovery Through Rates. I. No public utility shall recover through rates any costs associated with its attendance at, participation i
-
2026 HB1745-FN
amend · effective 2027-01-01
ity costs to ratepayers. Be it Enacted by the Senate and House of Representatives in General Court convened: 1 New Section; Prohibited Cost Recovery Through Rates. Amend RSA 374 by inserting after section 2-a the following new section: 374:2-b Prohibited Cost Recovery Through Rates. I. No public utility shall recover through rates any costs associated with its attendance at, participation i
-
2026 SB540
amend · effective 2027-01-01
Each plug-in solar generation system shall be installed and operated in accordance with the state building code and manufacturer instructions. 4 New Section; Liability. Amend RSA 374 by inserting after section 1-a the following new section: 374:1-b Liability for Plug-In Solar Generation Systems. An electric distribution utility shall not be liable for damage, injury, or compensation or charges ari
-
2026 SB540-FN
amend · effective 2027-01-01
Each plug-in solar generation system shall be installed and operated in accordance with the state building code and manufacturer instructions. 4 New Section; Liability. Amend RSA 374 by inserting after section 1-a the following new section: 374:1-b Liability for Plug-In Solar Generation Systems. An electric distribution utility shall not be liable for damage, injury, or compensation or charges ari