RSA 374:49 · Damage Prevention System
374:49 Damage Prevention System. – Each operator shall participate in an underground facility damage prevention system. The system shall operate during regular business hours throughout the year, except Saturdays, Sundays and legal holidays. The system shall receive notices of proposed excavations and transmit such notices to its members. Source. 1983, 294:1. 1997, 298:6, eff. June 20, 1997. 2010, 191:3, eff. Aug. 20, 2010.
Copy linkSource note
Source. 1983, 294:1. 1997, 298:6, eff. June 20, 1997. 2010, 191:3, eff. Aug. 20, 2010.
Source history
- 1983, 294:1
- 1997, 298:6, eff. June 20, 1997
- 2010, 191:3, eff. Aug. 20, 2010
Related materials
Bill relationships
-
2026 HB1169
amend
ng, Memorial Day, July 4th, known as Independence Day, and Labor Day, each person required to give notice of an excavation shall notify the damage prevention system referred to in RSA 374:49. Such notice shall occur no more than 30 days before the proposed excavation is to be made. 2 Notification by Excavator. Amend RSA 374:51, VI to read as follows: VI. The excavator's notification shall be valid for
-
2026 HB1743
amend
mart meters. Be it Enacted by the Senate and House of Representatives in General Court convened: 1 New Section; Public Utilities; Smart Meter Radiation Disclosure. Amend RSA 374 by inserting after section 2-a the following new section: 374:2-b Smart Meter Radiation Disclosure. I. Each electric utility operating in the state shall provide an annual written statement to each utility account h
-
2026 HB1743-FN
amend
mart meters. Be it Enacted by the Senate and House of Representatives in General Court convened: 1 New Section; Public Utilities; Smart Meter Radiation Disclosure. Amend RSA 374 by inserting after section 2-a the following new section: 374:2-b Smart Meter Radiation Disclosure. I. Each electric utility operating in the state shall provide an annual written statement to each utility account h
-
2026 HB1745
amend · effective 2027-01-01
ity costs to ratepayers. Be it Enacted by the Senate and House of Representatives in General Court convened: 1 New Section; Prohibited Cost Recovery Through Rates. Amend RSA 374 by inserting after section 2-a the following new section: 374:2-b Prohibited Cost Recovery Through Rates. I. No public utility shall recover through rates any costs associated with its attendance at, participation i
-
2026 HB1745-FN
amend · effective 2027-01-01
ity costs to ratepayers. Be it Enacted by the Senate and House of Representatives in General Court convened: 1 New Section; Prohibited Cost Recovery Through Rates. Amend RSA 374 by inserting after section 2-a the following new section: 374:2-b Prohibited Cost Recovery Through Rates. I. No public utility shall recover through rates any costs associated with its attendance at, participation i
-
2026 SB540
amend · effective 2027-01-01
Each plug-in solar generation system shall be installed and operated in accordance with the state building code and manufacturer instructions. 4 New Section; Liability. Amend RSA 374 by inserting after section 1-a the following new section: 374:1-b Liability for Plug-In Solar Generation Systems. An electric distribution utility shall not be liable for damage, injury, or compensation or charges ari
-
2026 SB540-FN
amend · effective 2027-01-01
Each plug-in solar generation system shall be installed and operated in accordance with the state building code and manufacturer instructions. 4 New Section; Liability. Amend RSA 374 by inserting after section 1-a the following new section: 374:1-b Liability for Plug-In Solar Generation Systems. An electric distribution utility shall not be liable for damage, injury, or compensation or charges ari