This RSA section is an unofficial mirror, is not legal advice, and may be incomplete, outdated, or incorrectly processed.

RSA 374:55 · Civil Penalty

374:55 Civil Penalty. –

Copy link
I.

Proof that an excavation has been made without compliance with the notice requirement of RSA 374:51 and that damage to an underground facility has occurred shall be prima facie evidence in any court or administrative proceeding that the damage was caused by the negligence of the excavator.

Copy link
II.

Any excavator who does not give notice of or identify the proposed excavation area as required by RSA 374:51 or rules of the department regarding tolerance zones and marking procedures shall be subject to the penalties in paragraph VIII, in addition to any liability for the actual damages.

Copy link
III.

Any operator which does not mark the location of its underground facilities as required by RSA 374:53 or rules of the department regarding tolerance zones and marking procedures shall be subject to the penalties in paragraph VIII.

Copy link
IV.

If underground facilities are damaged because an operator does not mark its underground facilities as required by RSA 374:53, the operator shall be subject to the penalties in paragraph VIII, liable for damages sustained to its facilities and, in addition, shall be liable for any damages incurred by the excavator as a result of the operator's failure to mark such facilities.

Copy link
V.

If marked underground facilities are damaged, the excavator shall be subject to the penalties in paragraph VIII and liable for the cost of repairs for the damage.

Copy link
VI.

Any excavator who damages an underground facility and fails to notify the operator, or backfills the excavation without receiving permission, as required by RSA 374:54, shall be subject to the penalties in paragraph VIII.

Copy link
VII.

The department or any department employee, involved in an underground facility damage prevention program approved by the department and designated by the department, may enforce violations of this subdivision. Any excavator or operator that violates this subdivision shall be subject to the penalties in paragraph VIII. In addition, the department may assess the excavator for expenditures made to collect the civil penalty. Any excavator or operator which suffers damage resulting from violation of this subdivision may petition the department to initiate an enforcement action.

Copy link
VIII.

Any excavator or operator that does not comply with RSA 374:51 through 374:54 shall be required either to complete an underground facility damage prevention program approved by the department, or to pay a civil penalty of up to $500. The civil penalty may be up to $5,000 if the excavator or operator previously violated RSA 374:51 through 374:54 within the prior 12 months or if the violation results in bodily injury or property damages exceeding $50,000, excluding utility costs. This paragraph shall not apply to a homeowner excavating on his or her own property or to a legal occupant of residential property excavating on the property of his or her primary residence with the permission of the owner. Source. 1983, 294:1. 1987, 72:1. 1990, 98:1, 2. 1991, 151:1. 1997, 298:12. 1999, 289:15. 2001, 186:5, eff. Jan. 1, 2002. 2010, 191:2, eff. Aug. 20, 2010. 2021, 91:276, eff. July 1, 2021.

Copy link

Source note

Source. 1983, 294:1. 1987, 72:1. 1990, 98:1, 2. 1991, 151:1. 1997, 298:12. 1999, 289:15. 2001, 186:5, eff. Jan. 1, 2002. 2010, 191:2, eff. Aug. 20, 2010. 2021, 91:276, eff. July 1, 2021.

Source history

  • 1983, 294:1
  • 1987, 72:1
  • 1990, 98:1, 2
  • 1991, 151:1
  • 1997, 298:12
  • 1999, 289:15
  • 2001, 186:5, eff. Jan. 1, 2002
  • 2010, 191:2, eff. Aug. 20, 2010
  • 2021, 91:276, eff. July 1, 2021

Related materials

Bill relationships

  • 2026 HB1743 amend

    mart meters. Be it Enacted by the Senate and House of Representatives in General Court convened: 1 New Section; Public Utilities; Smart Meter Radiation Disclosure. Amend RSA 374 by inserting after section 2-a the following new section: 374:2-b Smart Meter Radiation Disclosure. I. Each electric utility operating in the state shall provide an annual written statement to each utility account h

  • 2026 HB1743-FN amend

    mart meters. Be it Enacted by the Senate and House of Representatives in General Court convened: 1 New Section; Public Utilities; Smart Meter Radiation Disclosure. Amend RSA 374 by inserting after section 2-a the following new section: 374:2-b Smart Meter Radiation Disclosure. I. Each electric utility operating in the state shall provide an annual written statement to each utility account h

  • 2026 HB1745 amend · effective 2027-01-01

    ity costs to ratepayers. Be it Enacted by the Senate and House of Representatives in General Court convened: 1 New Section; Prohibited Cost Recovery Through Rates. Amend RSA 374 by inserting after section 2-a the following new section: 374:2-b Prohibited Cost Recovery Through Rates. I. No public utility shall recover through rates any costs associated with its attendance at, participation i

  • 2026 HB1745-FN amend · effective 2027-01-01

    ity costs to ratepayers. Be it Enacted by the Senate and House of Representatives in General Court convened: 1 New Section; Prohibited Cost Recovery Through Rates. Amend RSA 374 by inserting after section 2-a the following new section: 374:2-b Prohibited Cost Recovery Through Rates. I. No public utility shall recover through rates any costs associated with its attendance at, participation i

  • 2026 SB540 amend · effective 2027-01-01

    Each plug-in solar generation system shall be installed and operated in accordance with the state building code and manufacturer instructions. 4 New Section; Liability. Amend RSA 374 by inserting after section 1-a the following new section: 374:1-b Liability for Plug-In Solar Generation Systems. An electric distribution utility shall not be liable for damage, injury, or compensation or charges ari

  • 2026 SB540-FN amend · effective 2027-01-01

    Each plug-in solar generation system shall be installed and operated in accordance with the state building code and manufacturer instructions. 4 New Section; Liability. Amend RSA 374 by inserting after section 1-a the following new section: 374:1-b Liability for Plug-In Solar Generation Systems. An electric distribution utility shall not be liable for damage, injury, or compensation or charges ari