This RSA section is an unofficial mirror, is not legal advice, and may be incomplete, outdated, or incorrectly processed.
RSA 374:57 · Purchase of Capacity
374:57 Purchase of Capacity. – Each electric utility which enters into an agreement with a term of more than one year for the purchase of generating capacity, transmission capacity or energy shall furnish a copy of the agreement to the commission no later than the time at which the agreement is filed with the Federal Energy Regulatory Commission pursuant to the Federal Power Act or, if no such filing is required, at the time such agreement is executed. The commission may disallow, in whole or part, any amounts paid by such utility under any such agreement if it finds that the utility's decision to enter into the transaction was unreasonable and not in the public interest. Source. 1989S, 1:2, eff. Dec. 18, 1989. Redundant Electric Lines
Copy linkSource note
Source. 1989S, 1:2, eff. Dec. 18, 1989. Redundant Electric Lines
Source history
- 1989S, 1:2, eff. Dec. 18, 1989. Redundant Electric Lines
Related materials
Bill relationships
-
2026 HB1743
amend
mart meters. Be it Enacted by the Senate and House of Representatives in General Court convened: 1 New Section; Public Utilities; Smart Meter Radiation Disclosure. Amend RSA 374 by inserting after section 2-a the following new section: 374:2-b Smart Meter Radiation Disclosure. I. Each electric utility operating in the state shall provide an annual written statement to each utility account h
-
2026 HB1743-FN
amend
mart meters. Be it Enacted by the Senate and House of Representatives in General Court convened: 1 New Section; Public Utilities; Smart Meter Radiation Disclosure. Amend RSA 374 by inserting after section 2-a the following new section: 374:2-b Smart Meter Radiation Disclosure. I. Each electric utility operating in the state shall provide an annual written statement to each utility account h
-
2026 HB1745
amend · effective 2027-01-01
ity costs to ratepayers. Be it Enacted by the Senate and House of Representatives in General Court convened: 1 New Section; Prohibited Cost Recovery Through Rates. Amend RSA 374 by inserting after section 2-a the following new section: 374:2-b Prohibited Cost Recovery Through Rates. I. No public utility shall recover through rates any costs associated with its attendance at, participation i
-
2026 HB1745-FN
amend · effective 2027-01-01
ity costs to ratepayers. Be it Enacted by the Senate and House of Representatives in General Court convened: 1 New Section; Prohibited Cost Recovery Through Rates. Amend RSA 374 by inserting after section 2-a the following new section: 374:2-b Prohibited Cost Recovery Through Rates. I. No public utility shall recover through rates any costs associated with its attendance at, participation i
-
2026 SB540
amend · effective 2027-01-01
Each plug-in solar generation system shall be installed and operated in accordance with the state building code and manufacturer instructions. 4 New Section; Liability. Amend RSA 374 by inserting after section 1-a the following new section: 374:1-b Liability for Plug-In Solar Generation Systems. An electric distribution utility shall not be liable for damage, injury, or compensation or charges ari
-
2026 SB540-FN
amend · effective 2027-01-01
Each plug-in solar generation system shall be installed and operated in accordance with the state building code and manufacturer instructions. 4 New Section; Liability. Amend RSA 374 by inserting after section 1-a the following new section: 374:1-b Liability for Plug-In Solar Generation Systems. An electric distribution utility shall not be liable for damage, injury, or compensation or charges ari