RSA 374:6 · Inspection of Railroads

374:6 Inspection of Railroads. – The department of transportation shall have power, either through its members or duly authorized experts, to ride upon any locomotive or train of any railroad while in service for inspection purposes and to have, upon reasonable notice, a special locomotive and inspection car for a physical inspection once annually of all the lines and stations of each railroad in the state. Source. 1911, 164:5. PL 240:5. RL 289:5. 1951, 203:25. RSA 374:6. 1985, 402:6, I(e)(6).

Copy link

Source note

Source. 1911, 164:5. PL 240:5. RL 289:5. 1951, 203:25. RSA 374:6. 1985, 402:6, I(e)(6).

Source history

  • 1911, 164:5. PL 240:5. RL 289:5
  • 1951, 203:25. RSA 374:6
  • 1985, 402:6, I(e)(6)

Related materials

Bill relationships

  • 2026 HB1743 amend

    mart meters. Be it Enacted by the Senate and House of Representatives in General Court convened: 1 New Section; Public Utilities; Smart Meter Radiation Disclosure. Amend RSA 374 by inserting after section 2-a the following new section: 374:2-b Smart Meter Radiation Disclosure. I. Each electric utility operating in the state shall provide an annual written statement to each utility account h

  • 2026 HB1743-FN amend

    mart meters. Be it Enacted by the Senate and House of Representatives in General Court convened: 1 New Section; Public Utilities; Smart Meter Radiation Disclosure. Amend RSA 374 by inserting after section 2-a the following new section: 374:2-b Smart Meter Radiation Disclosure. I. Each electric utility operating in the state shall provide an annual written statement to each utility account h

  • 2026 HB1745 amend · effective 2027-01-01

    ity costs to ratepayers. Be it Enacted by the Senate and House of Representatives in General Court convened: 1 New Section; Prohibited Cost Recovery Through Rates. Amend RSA 374 by inserting after section 2-a the following new section: 374:2-b Prohibited Cost Recovery Through Rates. I. No public utility shall recover through rates any costs associated with its attendance at, participation i

  • 2026 HB1745-FN amend · effective 2027-01-01

    ity costs to ratepayers. Be it Enacted by the Senate and House of Representatives in General Court convened: 1 New Section; Prohibited Cost Recovery Through Rates. Amend RSA 374 by inserting after section 2-a the following new section: 374:2-b Prohibited Cost Recovery Through Rates. I. No public utility shall recover through rates any costs associated with its attendance at, participation i

  • 2026 SB540 amend · effective 2027-01-01

    Each plug-in solar generation system shall be installed and operated in accordance with the state building code and manufacturer instructions. 4 New Section; Liability. Amend RSA 374 by inserting after section 1-a the following new section: 374:1-b Liability for Plug-In Solar Generation Systems. An electric distribution utility shall not be liable for damage, injury, or compensation or charges ari

  • 2026 SB540-FN amend · effective 2027-01-01

    Each plug-in solar generation system shall be installed and operated in accordance with the state building code and manufacturer instructions. 4 New Section; Liability. Amend RSA 374 by inserting after section 1-a the following new section: 374:1-b Liability for Plug-In Solar Generation Systems. An electric distribution utility shall not be liable for damage, injury, or compensation or charges ari