This RSA section is an unofficial mirror, is not legal advice, and may be incomplete, outdated, or incorrectly processed.
RSA 374:62 · Property Owner's Consent Required for Smart Meter Gateway Devices
374:62 Property Owner's Consent Required for Smart Meter Gateway Devices. –
Copy link"Smart meter gateway device" means any electric utility meter, electric utility meter component, electric utility load control device, or device ancillary to the electric utility meter, which is located at an end-user's residence or business, and which serves as a communications gateway or portal to electrical appliances, electrical equipment, or electrical devices within the end-user's residence or business, or which otherwise communicates with, monitors, or controls such electrical appliances, electrical equipment, or electrical devices.
Copy link"Electric utility" means any public utility, as defined in RSA 362:2, which is engaged in the sale or distribution of electricity ultimately sold to the public, any rural electric cooperative, without regard to whether a certificate of regulation or deregulation is on file with the public utilities commission, and any municipal electric system operating pursuant to RSA 38 within or outside its municipal boundaries.
Copy link(a) No electric utility that sells or provides electricity within the state of New Hampshire shall install a smart meter gateway device on or in a person's home or business without the written consent of the person or persons who own the home or business.
Copy linkAn electric utility selling or providing electricity shall create a form that the person or persons who own the home or business must sign to opt-in to having a smart meter gateway device installed on or in his or her home or business. The form shall, in at least 12-point boldface type, state that:
Copy linkThe opt-in is optional and one's service will not be affected if one elects not to opt-in; and
Copy linkThe device is a "smart meter gateway device," and provide the definition in subparagraph I(a).
Copy linkWhen an electric utility enrolls a homeowner or business owner for electrical service at his or her home or business, the electric utility shall disclose in writing whether a smart meter gateway device has been installed, and shall remove, or allow to be removed, all smart meter gateway devices upon written request of the homeowner or business owner. Source. 2012, 150:1, eff. June 7, 2012.
Copy linkSource note
Source. 2012, 150:1, eff. June 7, 2012.
Source history
- 2012, 150:1, eff. June 7, 2012
Related materials
Bill relationships
-
2026 HB1743
amend
mart meters. Be it Enacted by the Senate and House of Representatives in General Court convened: 1 New Section; Public Utilities; Smart Meter Radiation Disclosure. Amend RSA 374 by inserting after section 2-a the following new section: 374:2-b Smart Meter Radiation Disclosure. I. Each electric utility operating in the state shall provide an annual written statement to each utility account h
-
2026 HB1743-FN
amend
mart meters. Be it Enacted by the Senate and House of Representatives in General Court convened: 1 New Section; Public Utilities; Smart Meter Radiation Disclosure. Amend RSA 374 by inserting after section 2-a the following new section: 374:2-b Smart Meter Radiation Disclosure. I. Each electric utility operating in the state shall provide an annual written statement to each utility account h
-
2026 HB1745
amend · effective 2027-01-01
ity costs to ratepayers. Be it Enacted by the Senate and House of Representatives in General Court convened: 1 New Section; Prohibited Cost Recovery Through Rates. Amend RSA 374 by inserting after section 2-a the following new section: 374:2-b Prohibited Cost Recovery Through Rates. I. No public utility shall recover through rates any costs associated with its attendance at, participation i
-
2026 HB1745-FN
amend · effective 2027-01-01
ity costs to ratepayers. Be it Enacted by the Senate and House of Representatives in General Court convened: 1 New Section; Prohibited Cost Recovery Through Rates. Amend RSA 374 by inserting after section 2-a the following new section: 374:2-b Prohibited Cost Recovery Through Rates. I. No public utility shall recover through rates any costs associated with its attendance at, participation i
-
2026 SB540
amend · effective 2027-01-01
Each plug-in solar generation system shall be installed and operated in accordance with the state building code and manufacturer instructions. 4 New Section; Liability. Amend RSA 374 by inserting after section 1-a the following new section: 374:1-b Liability for Plug-In Solar Generation Systems. An electric distribution utility shall not be liable for damage, injury, or compensation or charges ari
-
2026 SB540-FN
amend · effective 2027-01-01
Each plug-in solar generation system shall be installed and operated in accordance with the state building code and manufacturer instructions. 4 New Section; Liability. Amend RSA 374 by inserting after section 1-a the following new section: 374:1-b Liability for Plug-In Solar Generation Systems. An electric distribution utility shall not be liable for damage, injury, or compensation or charges ari