RSA 53-F:6 · Qualifying Improvements

53-F:6 Qualifying Improvements. –

Copy link
I.

The authority shall establish a C-PACER application and review process to review and evaluate project applications for C-PACER financing and prescribe the form and manner of the application. Under the application, an applicant shall demonstrate:

Copy link
(a)

That the project provides a benefit to the public in the form of energy or water resource conservation, reduced public health costs and/or risk, or reduced public emergency response cost and/or risk.

Copy link
(b)

For an existing building:

Copy link
(1)

Where energy or water usage improvements are proposed, an energy analysis by a licensed engineering firm or engineer, or other qualified professional listed in the program guidebook, stating that the proposed qualified improvements will either result in more efficient use or conservation of energy or water, the reduction of greenhouse gas emissions, or the addition of renewable sources of energy or water, or

Copy link
(2)

Where renewable energy is proposed, an engineering study showing that the improvements are feasible; or

Copy link
(3)

Where resilience improvements are proposed, certification by a licensed professional engineer stating that the qualified improvements will result in improved resilience.

Copy link
(c)

For new construction, certification by a licensed professional engineer or engineering firm stating that the proposed qualified improvements will enable the project to exceed the energy efficiency or water efficiency or renewable energy or water usage or resilience requirements of the current building code.

Copy link
II.

(a) The principal amount of any financing, excluding interest, shall not exceed 35 percent of the appraised real property value, as stabilized or as complete, or the actual cost of installing renewable energy systems, energy efficiency improvements, water efficiency improvements and resiliency improvements, including the costs of necessary equipment, materials, and labor, financing costs, ancillary costs, the costs of each related energy or water audit or feasibility study, and the cost of verification of such renewable energy system and energy efficiency, water efficiency, and resiliency improvements.

Copy link
(b)

The financing for assessments imposed may also include but is not limited to:

Copy link
(1)

Permit fees;

Copy link
(2)

Inspection fees;

Copy link
(3)

Lender fees;

Copy link
(4)

Program application and administrative fees;

Copy link
(5)

Project development and engineering fees;

Copy link
(6)

Interest reserves;

Copy link
(7)

Capitalized interest, in an amount determined by the owner of the commercial property and the third-party providing financing under this section; and

Copy link
(8)

Any other fees or costs incurred by the property owner incident to the installation, modification, or improvement on a specific or pro rata basis.

Copy link
III.

The recording of all documents under this section may be performed by the municipality or their designee. A municipality's duties in a program shall include the:

Copy link
(a)

Timely execution of the written assessment contract between the property owner and the municipality, by a duly authorized official, as well as execution of the municipality notice of assessment and C-PACER lien; and

Copy link
(b)

Execution of the assignment of the assessment agreement and the notice of assessment and C-PACER lien to the capital provider.

Copy link
IV.

The authority and any municipality, its officers, and employees, shall not be liable at law and equity for any actions taken in pursuant of this section, except for gross and willful misconduct. Neither the members of the authority's board of directors, nor any officer or employee of the authority shall be personally liable in ordinary negligence under this chapter. The state shall indemnify a board member or officer or employee of the authority for expenses related to defense against an ordinary negligence action. Neither the state nor the authority nor any officer or employee of either of them shall be subject to any liability for actions taken to protect the interests of the state, the authority, or any owner of the authority's bonds, provided that such actions are not reckless or wanton.

Copy link
V.

After an approved project is completed, an applicant shall provide to the authority written verification, as defined in the program guidebook, stating that the qualified project was properly completed and is operating as intended. Source. 2010, 215:2, eff. Aug. 27, 2010. 2015, 121:5, eff. June 8, 2015. 2021, 91:218, eff. July 1, 2021. 2025, 1:6, eff. March 10, 2025.

Copy link

Source note

Source. 2010, 215:2, eff. Aug. 27, 2010. 2015, 121:5, eff. June 8, 2015. 2021, 91:218, eff. July 1, 2021. 2025, 1:6, eff. March 10, 2025.

Source history

  • 2010, 215:2, eff. Aug. 27, 2010
  • 2015, 121:5, eff. June 8, 2015
  • 2021, 91:218, eff. July 1, 2021
  • 2025, 1:6, eff. March 10, 2025

Related materials

Bill relationships

  • 2026 HB1285 amend · effective 2026-10-15

    Be it Enacted by the Senate and House of Representatives in General Court convened: 1 New Subdivision; Energy Efficient and Clean Energy Districts; R-Pacer Commission. Amend RSA 53-F by inserting after section 8 the following new subdivision: Energy Efficient and Clean Energy Districts; R-Pacer Commission 53-F:9 R-Pacer Commission. I. There is established a commission to study if New Hampsh

  • 2026 HB595 reference

    nd financed under this chapter, all such improvements must be permanently affixed to a building or facility that is part of the property and shall be qualifying improvements under RSA 53-F:6. (b) “Flood resiliency improvement” means providing flood and water damage mitigation and resiliency improvements, prioritizing repairs, replacement, or improvements that qualify for reductions in flood insurance premi

  • 2026 HB595-FN reference

    nd financed under this chapter, all such improvements must be permanently affixed to a building or facility that is part of the property and shall be qualifying improvements under RSA 53-F:6. (b) “Flood resiliency improvement” means providing flood and water damage mitigation and resiliency improvements, prioritizing repairs, replacement, or improvements that qualify for reductions in flood insurance premi

  • 2026 SB440 reference

    l consist of the following statement or its substantial equivalent: "This property is subject to a special assessment related to the installation of qualifying improvements under RSA 53-F." 4 Effective Date. This act shall take effect upon its passage. HELPFUL LINKS Redistricting Information Ethics Committee Statutory/Study Committees Voting Records Past Member Legislation Driving Directions IT He

  • 2026 SB590 add

    cing of energy conservation and efficiency and clean energy improvements by participating property owners in an energy efficiency and clean energy district established pursuant to RSA 53-F; [or] (g) Facilitating transactions relative to municipal group net metering[.]; or 3 Effective Date. This act shall take effect 60 days after its passage. LBA 26-2167 02/03/2026 SB 590-FN- FISCAL NOTE A

  • 2026 SB590-FN add

    cing of energy conservation and efficiency and clean energy improvements by participating property owners in an energy efficiency and clean energy district established pursuant to RSA 53-F; [or] (g) Facilitating transactions relative to municipal group net metering[.]; or 3 Effective Date. This act shall take effect 60 days after its passage. LBA 26-2167 02/03/2026 SB 590-FN- FISCAL NOTE A