This page is an unofficial LFoD record and is not legal advice. Verify the document against the official source before relying on it.
Governor and Executive Council Agenda item PDF - 2026-01-07 - agenda 42
- Document type
- Other
- Status
- imported
- Citation
- Governor and Executive Council Agenda item PDF - 2026-01-07 - agenda 42
- Date
- January 7, 2026
Serving Councilors
Linked by service date; this is not an individual vote unless the official source says so.
- Joseph Kenney District 1 Serving councilor
- Karen Liot Hill District 2 Serving councilor
- Janet L. Stevens District 3 Serving councilor
- John Stephen District 4 Serving councilor
- David K. Wheeler District 5 Serving councilor
- Meeting Date
- 2026-01-07
- Attachment Kind Label
- Agenda item PDF
- Attachment Relation
- primary_meeting_attachment
- Agenda Numbers
- 42
- Agency Names
- Department Of Environmental Services
- Parent Meeting Title
- Governor and Executive Council meeting - 2026-01-07
The State of New Hampshire
/ Department of Environmental ServicNHDES
Robert R. Scott, Commissioner
JAW Q 7 2m
December 3, 2025
Her Excellency, Governor Kelly A. Ayotte
and the Honorable Council
State House
Concord, New Hampshire 03301
REQUESTED ACTION
Authorize the New Hampshire Department of Environmental Services (NHDES) to enter into a RETROACTIVE, SOLE
SOURCE amendment to the contract (PC #1087954) with Busby Construction Co., Inc., (VC #155275-8001) Atkinson, NH
for as-needed and emergency earthworks repair services for the Winnipesaukee River Basin Program (WRBP) by
increasing the contract amount by $450,000 to $747,000 from $297,000 and extending the contract completion date from
June 30, 2025 to June 30, 2028, effective as of July 1, 2025 through June 30, 2028 upon Governor and Council approval.
The original contract was approved by the Governor and Council on July 27, 2022, Item No. 72. 100% WRBP Funds.
Funding is available in account as follows, with the authority to adjust encumbrances in each of the State fiscal years
though the Budget Office, if needed and justified. Funding for FY28 is contingent upon the availability and continued
appropriation of funds.
FY26 FY27 FY28
$150,000 $150,000 $150,000
03-44-44-442010-1300-048-500226
Dept. Environmental Services, Winnipesaukee River Basin, Contractual Repairs-Buildings & Grounds
EXPLANATION
Approval of this amendment will authorize Busby Construction Co., Inc. (Busby) to continue to provide as-needed and
emergency earthwork repair services in support of the compliant operations and maintenance of the WRBP infrastructure
located in the Lakes Region. This is a Retroactive amendment since the original contract expired during negotiations
with Busby so necessary paperwork was not provided in a timely fashion. This is a Sole Source request since the amount
of the amendment is greater than 10 percent of the original contract price limitation. The amendment allows the
continued timely provision of these specialty services from a qualified, capable, local firm. $236,036 of the original
$297,000 contract has been expended.
The WRBP owns and operates the wastewater collection and treatment system serving the communities of
Moultonborough, Center Harbor, Meredith, Gilford, Laconia, Sanbornton, Belmont, Tilton, Northfield, and Franklin. The
system includes 14 pumping stations, approximately 65 miles of interceptor sewer and the wastewater treatment plant
in Franklin. The system was constructed in the late 1970's and has no tolerance for failures or interruption in service.
Having a contract for as-needed and emergency earthwork services expedites necessary repairs and emergency
responses and reduces the need for retroactive requests for payment of such services. These tasks cannot be
completed by NHDES staff because a broad variety of specialty experience and equipment is required for this type of
work.
DBS Web Site: www.des.nh.gov
P.O. Box 95,29 Hazen Drive, Concord, New Hampshire 03302-0095
Telephone: (603)271-3449 Fax:(603)271-2867 TDD Access: Relay NH 1-800
Her Excellency, Governor Kelly A. Ayotte
and the Honorable Council
Page 2
The work to be completed under this amendment may involve, but is not limited to, repairs to roadways, rail crossings,
culverts, drainage swales, right of ways, and forcemains and gravity interceptor sewers which range in size from 8-60
inches. There may also be projects for which services may be required relating to other buildings and structures within
the WRBP system (ex. valve vaults, siphons, river crossings, etc.). Timely responses to sanitary sewer overflows or
other emergencies are also part of this contract amendment, and Busby has been the only firm effectively responding
in the last five-plus years to such events; being very experienced in repairing sewer infrastructure.
Note that all operating costs of the WRBP are billed back to the users of the facilities, as provided in RSA 485-A:50. There
is no General Fund contribution to the WRBP operation. Busby updated their billing rates for Amendment 1 on the
attached Exhibit C for FY26-28. The WRBP deems these rates to be reasonable and customary for such work. Each as-
needed task scope and budget are negotiated priorto work being authorized. No cost is incurred unless the WRBP requests
services.
This amendment has been approved by the Department of Justice as to form, substance, and execution.
We respectfully request your approval of this item.
Robert R. Scott, doommissioner
New Hampshire Department of Environmental Services
Busby Construction Co., Inc.
Amendment No. 1
This Agreement (hereinafter called the "Amendment #1") is by and between the State of New
Hampshire acting by and through its Department of Environmental Services, Water Division
(hereinafter referred to as the "State") and Busby Construction Co., Inc. (hereinafter referred to
as the Busby).
WHEREAS, pursuant to an agreement (hereinafter called the "Agreement") approved by the
Governor and Council on July 27, 2022, Item No. 72, Busby agreed to perform certain services
under the terms and conditions specified in the Agreement and in consideration of payment by
the State of certain sums specified herein; and
WHEREAS, pursuant to the provisions of paragraph 18 of the Agreement, the Agreement may be
amended, waived or discharged only by written instrument executed by the parties thereto; and
WHEREAS, Busby and the State have agreed to retroactively amend the Agreement in certain
respects.
NOW THEREFORE, in consideration of the foregoing, and the covenants and conditions contained
in the Agreement and set forth herein, the parties hereto do hereby agree as follows:
1. Amendment and Modification of Agreement
The Agreement is hereby amended as follows:
A. The price limitation governing the Agreement as set forth in the Agreement (line 1.8 of
the General Provisions) and as referenced in Amendment 1 - Exhibit C, Costs and Terms
of Payment shall be increased by $450,000 from $297,000 to $747,000.
B. The completion date of the Agreement is modified to June 30, 2028 from June 30, 2025.
2. Effective Date of Amendment
This Amendment shall take effect upon the date of approval of this Amendment by the
Governor and Executive Council of the State of New Hampshire.
3. Continuation of Agreement
Except as specifically amended and modified by the terms and conditions of this Amendment,
the Agreement and the obligations of the parties thereunder, shall remain in full force and
effect with the terms and conditions set forth.
IN WITNESS WHEREOF, the parties set their hands as of the day and year first written below.
THE STATE OF NEW HAMPSHIRE
Department of Environmental Servi
DATE
Robert R. Scott, Commissioner
■ /z/j'Ar
New Hampshire Department of Environmental Services
Busby Construction Co., Inc.
Amendment No. 1
Busbv Construction Co.. Inc.
By:.
Paul Busby, President
DATE: JjJiL/
Approval bv ATTORNEY GENERAL (Form. Substance and Execution):
Assistant Attorney General Signature
LovodWJ
i2Vta/a^S
Date
Approved bv the GOVERNOR and COUIMCIL this day of. 2025
AMENDMENT 1 - EXHIBIT C
PRICE AND PAYMENTS
FY25 for Reference Balance of FY26
1} Staff & Equipment Cost (Hourly Rates):
Excavator w/ Operator - full size w/ 25 ft digging depth
Excavator w/ operator (Midi class)
Loader w/ Operator (Medium class)
Dozer (Medium class)
Laborer
Foreman or Supervisor
Please include alternative sizes and types of equipment
Other (specify those with hourly rates)
Compactor, roller
Compactor, vibration
4-wheel rubber tired backhoe
Excavator, rubber tired
Tri-axle Dump Truck w/ Driver (8 cy min.)
Mini Excavator
2) Other Equipment Costs (specify hourly or daily rates):
Trench box (Daily Rate) 6x20 trench box
Pump for dewatering excavation/trench Daily rate
Plates - per each 8x20 (Per Job)
Skid Steer w/ Daily Rate
3) Materials & Services (Enter % markup over cost):
Sand and Gravel, per cubic yard
Riprap stone, per cubic yard
Pipe & Fittings
Please include other materials and services (Enter % markup over cost):
Other materials (specify):
Other materials (specify);
Other services (specify);
Other services (specify);
Other services (specify);
Other services (specify);
Other services (specify):
Loam
Aggregates
paving subcontractor
equipment rental
Raising manholes
Flaggers
Signs & Warning Devices for Traffic Control
4) Equipment Haul/Mob/DemobA ravel
Travel Costs (Per mile charge):
Equipment Haul, if not included in 1) above - per machine delivered
Mobilization/Demobilization, if not included in 1) above - per/mob
5) Other Supplies (Enter % markup over cost):
For all supplies (% markup, if any)
Pf Price Limitation:
FY26-28 Total Contract Price Limitation:
6) Non-emergency Response Timeframe (calendar days)
Busbv Construction Co.. Inc.
Company Name
FY28
S230.00 $ 235.00 $ 245.00 $ 255.00
S^os.nn $ 210.00 $ 220.00 $ 230.00
S160.00 $ 165.00 $ 170.00 $ 175.00
S190.00 $ 195.00 S 200.00 $ 205.00
S50.00 $ 55.00 $ 60.00 $ 65.00
$95.00 $ 100.00 $ 105.00 $ 110.00
$95.00 $ 100.00 $ 105.00 $ 110.00
$35.00 $ 40.00 $ 45.00 $ 50.00
$140.00 $ 145.00 $ 150.00 $ 155.00
$175.00 $ 175.00 $ 185.00 $ 195.00
$120.00 $ 125.00 $ 130.00 $ 135.00
$130.00 $ 135.00 $ 140.00 $ 145.00
$300.00 $ 300.00 $ 315.00 $ 330.00
$250.00 $ 250.00 $ 260.00 $ 270.00
$300.00 $ 300.00 $ 315.00 $ 330.00
$900.00 $ 900.00 $ 950.00 $ 1,000.00
15% $ 15.00 $ 15.00 $ 15.00
15% $ 15.00 $ 15.00 $ 15.00
15% $ 15.00 $ 15.00 $ 15.00
15% $ 15.00 $ 15.00 $ 15.00
15% $ 15.00 $ 15.00 $ 15.00
10% $ 10.00 $ 10.00 $ 10.00
15% $ 15.00 $ 15.00 $ 15.00
15% $ 15.00 $ 15.00 $ 15.00
10% $ 10.00 $ 10.00 $ 10.00
15% $ 15.00 $ 15.00 $ 15.00
$7.00 $ 7.00 $ 7.50 $ 8.00
$700.00 $ 700.00 $ 775.00 $ 850.00
$1,700.00 $ 1,700.00 $ 1,800.00 $ 1,900.00
15% $ 15.00 $ 15.00 $ 15.00
$150,000 $150,000 S150.000
$450,000
1-7 dgys
Notes:
(1) Contractor to be paid within thirty (30) days of submission of invoice at satisfactory completion of work. Approval of this contract does not authorize any expenditure over
the price limitation.
EXHIBIT C-
Contractor Initials
Date
<!as.
state of New Hampshire
Department of State
CERTIFICATE
I, David M. Scanlan, Secretary of State of the State of New Hampshire, do hereby certify that BUSBY CONSTRUCTION CO.,
INC. is a New Hampshire Profit Corporation registered to transact business in New Hampshire on August 02, 1979.1 further
certify that all fees and documents required by the Secretary of State's office have been received and is in good standing as far as
this office is concerned.
Business ID: 5783
Certificate Number: 0007266352
%
1
IN TESTIMONY WHEREOF,
I hereto set my hand and cause to be affixed
the Seal of the State of New Hampshire,
this 28th day of August A.D. 2025.
David M. Scanlan
Secretary of State
BUSBY CONSTRUCTION CO., INC. 71 ROUTE 111
ATKINSON, NH 03811
(603) 898-4800
FAX (603) 898-4808
Corporate Resolution
I, Virginia A. Busbv. hereby certify that I am duly elected Clerk/Secretary of Busbv Construction
(Name) (Name of Corporation)
Co.. Inc. ■ I hereby certify the following is a true copy of a vote taken at a meeting of the Board
of Directors/shareholders, duly called and held on January 6. 2025 at which a quorum of the
Directors/shareholders were present and voting.
VOTED: That Paul D. Busbv. President is duly authorized to enter into contracts or
(Name and Title)
agreements on behalf of Busbv Construction Co.. Inc. with the State of New Hampshire D.E.S. and
(Name of Corporation)
any of its agencies or departments and further is authorized to execute any documents which may in
his judgment be desirable or necessary to effect the purpose of this vote.
I hereby certify that said vote has not been amended or repealed and remains in full force and
effect as of the date of the contract to which this certificate is attached. I further certify that it is
understood that the State of New Hampshire D.E.S. will rely on this certificate as evidence that the
person listed above currently occupies the position indicated and that they have full authority to bind
the corporation. To the extent that there are any limits on the authority of any listed individual to
bind the corporation in contracts with the State of New Hampshire, all such limitations are expressly
stated herein.
DATED: November 11. 2025 ATTEST: _
A (Name and Titie^
A.CORO> CERTIFICATE OF LIABILITY INSURANCE
DATE (MM/DD/YYYY)
11/11/2025
THIS CERTIFICATE IS ISSUED AS A MATTER OF INFORMATION ONLY AND CONFERS NO RIGHTS UPON THE CERTIFICATE HOLDER. THIS
CERTIFICATE DOES NOT AFFIRMATIVELY OR NEGATIVELY AMEND, EXTEND OR ALTER THE COVEFtAGE AFFORDED BY THE POLICIES
BELOW. THIS CERTIFICATE OF INSURANCE DOES NOT CONSTITUTE A CONTRACT BETWEEN THE ISSUING INSURER(S), AUTHORIZED
REPRESENTATIVE OR PRODUCER, AND THE CERTIFICATE HOLDER.
IMPORTANT: If the certificate holder Is an ADDITIONAL INSURED, the pollcy(les) must have ADDITIONAL INSURED provisions or be endorsed.
If SUBROGATION IS WAIVED, subject to the terms and conditions of the policy, certain policies may require an endorsement. A statement on
this certificate does not confer rights to the certificate holder In lieu of such endorsement(s).
PRODUCER
Arthur J. Gallagher Risk Management Services, LLC
45 Constitution Ave P.O. Box 511
Concord NH 03301
License#: 0D69293
NAME**^^ Donna Bickford
Ta^^^'no Extv 800-238-3840 noI: 603-224-8012
AiJDREss: donna bickford@aiq.com
INSURER(S) affording COVERAGE NAIC#
INSURER A Firemens Insurance Company of WA, D.C. 21784
INSURED BUSBCON-01
Busby Construction Co., Inc.
71 Route 111
Atkinson NH 03811
INSURER B Acadia Insurance Company 31325
INSURER C Charter Oak Fire Insurance Company 25615
INSURER D
INSURER E
INSURER F
COVERAGES CERTIFICATE NUMBER; 1403230041 REVISION NUMBER:
THIS !S TO CERTIFY THAT THE POLICIES OF INSURANCE LISTED BELOW HAVE BEEN ISSUED TO THE INSURED NAMED ABOVE FOR THE POLICY PERIOD
INDICATED. NOTWITHSTANDING ANY REQUIREMENT. TERM OR CONDITION OF ANY CONTRACT OR OTHER DOCUMENT WITH RESPECT TO WHICH THIS
CERTIFICATE MAY BE ISSUED OR MAY PERTAIN. THE INSURANCE AFFORDED BY THE POLICIES DESCRIBED HEREIN IS SUBJECT TO ALL THE TERMS.
EXCLUSIONS AND CONDITIONS OF SUCH POLICIES. LIMITS SHOWN MAY HAVE BEEN REDUCED BY PAID CLAIMS.
INSR
LTR TYPE OF INSURANCE
ADDL
INSD
SUBR
WVD POLICY NUMBER
POLICY EFF
(MM/DD/YYYY)
POLICY EXP
(MM/DD/YYYY) LIMITS
A X COMMERCIAL GE.NERAL LIABILITY
DE 1 ^ 1 OCCUR
CPA1500894-35 6/7/2025 6/7/2026 EACH OCCURRENCE $1,000,000
CLAIMS-MAC
DAMAGE TO RENTED
PREMISES (Ea occurrence) $300,000
MED EXP (Any one person) $10,000
PERSONAL & ADV INJURY $1,000,000
GEN'L AGGREGATE LIMIT APPLIES PER: GENERAL AGGREGATE $2,000,000
POLICY \_^ jEcf LAJ LOC
OTHER:
PRODUCTS - COMP/OP AGG $2,000,000
$
A AUTOMOBILE LIABILITY CAA150089536 6/7/2025 6/7/2026 COMBINED SINGLE LIMIT
(Ea accident) $1,000,000
X ANY AUTO
HEDULED
TOS)N-OWNED
TOS ONLY
BODILY INJURY (Per person) $
OWNED
AUTOS ONLY
HIRED
AUTOS ONLY
SC
Al
BODILY INJURY (Per accident)$
NC
Al
PROPERTY DAMAGE
(Per accident) $
$
B X UMBRELLA LIAB
EXCESS LIAB
X OCCUR
CLAIMS-MADE
CUA150089636 6/7/2025 6/7/2026 EACH OCCURRENCE $5,000,000
AGGREGATE $5,000,000
DED ^ RETENTION $n P/CO aggregate $5,000,000
A WORKERS COMPENSATION
AND EMPLOYERS' LIABILITY y / N
ANYPROPRIETOR/PARTNER/EXECUTIVE rrn
OFFICER/MEMBEREXCLUDED?
(Mandatory In NH) ' '
If yes, describe under
DESCRIPTION OF OPERATIONS below
HI A
WPA150089737 6/712025 6/7/2026 Y PER Y OTH-
^ STATUTE ^ ER 3A: NH MA ME
E.L. EACH ACCIDENT $1,000,000
E.L. DISEASE - EA EMPLOYEE $1,000,000
E.L. DISEASE - POLICY LIMIT $1,000,000
C Leased/Rented Equip-ACV QT660B1428251COF25 6/7/2025 6/7/2026 LIMIT:
DEDUCTIBLE:
1,200,000
1,000
DESCRIPTION OF OPERATIONS / LOCATIONS/VEHICLES (ACORD 101, Additional Remarks Schedule, may be attached if more space Is required)
RE: As needed or emergency earthworks repair services. Covering operations of the insured during the policy period. Following applies when required by
written contract with the named insured: NH Department of Environmental Services-WRBP & owner are Included as add'l insureds (ongoing and completed
operations) on all liability policies except workers comp on a primary non-contributory basis. Waiver in favor of A! applies except where prohibited by law.
state of NH
Dept of Environmental Services
WRBP Franklin WWTP
528 River St
P.O. Box 68
Franklin NH 03235
1 United States
SHOULD ANY OF THE ABOVE DESCRIBED POLICIES BE CANCELLED BEFORE
THE EXPIRATION DATE THEREOF, NOTICE WILL BE DELIVERED IN
ACCORDANCE WITH THE POLICY PROVISIONS.
AUTHORIZED REPRESENTATIVE
ACORD 25 (2016/03)
© 1988-2015 ACORD CORPORATION. All rights reserved.
The ACORD name and logo are registered marks of ACORD
Case records
Open case pageDocket: 2026-0001
| Date | Record Text | Type | Party | |
|---|---|---|---|---|
| January 7, 2026 | Governor and Executive Council Agenda item PDF - 2026-01-07 - agenda 42 Current page | Other |