Governor and Executive Council Agenda item PDF - 2026-03-04 - agenda 3

c-i<k

Deptuiment of Transportation

the sta te of new Hampshire

T DEPARTMENT OF TRANSPOkTA TION•11 5AMAR 0 A 2026William Cuss, P.E. David Rodrigue, P.E.

Commissioner Assistant Commissioner

Michelle L. Winters

Deputy Commissioner

Her Excellency, Governor Kelly A. Ayotte Bureau of Planning & Community Assistance

and the Honorable Council January 29, 2026

State House

Concord, New Hampshire 03301

INFORMATIONAL ITEM

The Department of Transportation requests placing this item on the Consent Calendar.

In accordance with the requirements approved by Governor and Executive Council March 23, 2022, Item #47, the

NH Department of Transportation is to submit on an annual basis a status report of all active state and federally

funded locally administered projects.

Attached please find the NHDOT 2025 Local Public Agency (LPA) Annual Report.

EXPLANATION

Governor and Executive Council Item #47(1) approved on March 23, 2022, authorized the Department of

Transportation to enter into local project agreements to provide funding and services within available state and

federal funding programs for transportation projects located throughout the state. These projects have been

identified and selected as part of the State's Ten-Year Plan and will be administered through the Department's

local project administration process. These agreements, between the State and local public agencies delineate

responsibilities for providing services necessary to manage the design and construction of a state or federally

funded locally managed project under the applicable provisions of state law (RSA 228 thru 242) and/or federal

highway statutes and regulations (United States Code Title 23 and Title 49).

In addition, to assure the oversight of the Governor and Executive Council, the Department of Transportation was

authorized as part of Item #47(2) to prepare an annual status report of all active state and federally funded, locally

administered projects. Information in the annual status report includes project city/town (name), project number,

scope of work, budget, and schedule. The Department of Transportation is submitting this annual status report as

an informational item to the Governor and Executive Council.

It is respectfully requested that this item be accepted.

Sincerely,

William J. Cass, PE

Commissioner

Attachment: NHDOT 2025 Local Public Agency (LPA) Annual Report

JOHN O. MORTON BUILDING • 7 HAZEN DRIVE • P.O. BOX 483 • CONCORD, NEW HAMPSHIRE 03302-0483

TFI FPHONE: (6031 271-3734 « FAX: (603) 271-3914 • TDD: RELAY NH 1-800-735-2964 « DOT.NH.GOV

NHDOT 2025 Local Public Agency (LPA) Annual Report

Locally Administered Projects with State and/or Federal Funds

Effective Date - October 1. 2025

Introduction:

In the late 1990's, the Department formalized a municipally managed process for New Hampshire towns

and cities to receive federal and / or state funds through the NHDOT as a sub-recipient. The

implementation of this municipally managed process allowed for more local decision making and local

control of transportation projects that target local infrastructure improvements. As part of this process,

NHDOT retained an oversight and approval role ensuring proper use of federal or state funds and

consistent implementation of transportation standards and practices statewide. Over time and in

cooperation with Federal Highway Administration (FHWA), the municipally managed process has

evolved, grown, and is now referred to as the NHDOT Local Public Agency (LPA) Program. The

following manuals describe NHDOT's Local Public Agency process for state and federally funded

projects:

LPA Federal Aid Manual.pdf Cnh.gov')

LPA State Bridge Aid Process.pdf (nh.govl

LPA State Highway Aid Process.doc ("nh.govl

LPA projects are typically funded with 80% federal or state funds and with a 20% local match, although

other funding percentages can be used on a case-by-case basis depending on the individual program.

Currently the LPA program is funded with a variety of funding sources including but not limited to:

Program

Acronym Common State and Federal Funding Sources for LPA projects

SBA State Bridge Aid Program

SHA State Highway Aid Program (limited funding - program sun-setting)

TAP Federal Transportation Alternatives Program

CMAQ Federal Congestion Mitigation Air Quality Program

MOBRR Federal Municipally Owned Bridge Rehabilitation and Replacement Program

MOBIL Federal Municipally Owned Bipartisan Infrastructure Law Program

BRG-LPA-RR Federal Bridge LPA Rehabilitation and Reconstruction (Larger Local Bridges)

HSIP Federal Highway Safety Improvement Program

Fed-Aid-LPA Federal Highway Funds for Local Public Agency Projects

FLAP Federal Lands Access Program

Ear-NH Congressionally Designated Spending - Earmarks

SRTS

Federal Safe Routes to School Program (limited funding - program is sun-

setting)

The funding programs noted above contribute approximately $45 million dollars of federal and state

funds available annually to local communities thru NHDOT. Additional information about NHDOT's

LPA program and funding sources can be found on the Department's website; Municipalities

(Communitv Assistance) | Department of Transportation ("nh.gov)

Projects Summary

There are currently 278 planned or active projects in NHDOT's LPA program including:

Number of

Projects Project Status

138 Enrolled in Ten Year Plan, but not actively incurring expenses

84 In design

20 In construction

32 In the close out process

4 Completed and closed out this year

Overall Program Costs

The 278 proiects being reported in this FY2025 annual report total $728 million of project costs including

federal, state, and local funds combined. The average cost per project over the entire program is equal to

$2.62 million.

Number of proiects with commonlv used funding sources

* Number of

Projects Common Types of Funding

8 Projects with Federal HSIP funding

46 Projects with CMAQ funding

49 Projects with Federal TAP funding

55 Projects with Federal and/or State Highway funding

119 Projects with Federal and/or State Bridge funding

*Due to projects with multiple sources of funding adding these totals will not match the 278 total number

of projects reported in this annual report

2025 Projects Approved to Advertise for Bids

Twenty-Six (26) local projects were approved by NHDOT to advertise for construction in State and/or "

Federal fiscal year FY2025 totaling $85.5 million. The FY2025 LPA projects approved to advertise are

as follows:

^^Project Name «»^roiect4iM.

ALSTEAD 40649 Bridge Replace Hill Road over Darby Brook Br. #059/134

ANTRIM 14942 Bridge Replace High Street over Great Brook Br.# 174/070

BARRINGTON 41410 Bridge Replace Old Settlers Road over Spruce Brook Br. #052/059

BEDFORD 21684 Bridge Replace Greenfield Pkway over Riddle Brook Br. #157/068

BEDFORD-

MERRIMACK 24217 Bridge Replace Beals Rd over Baboosic Brook Br. #105/055

*BERLIN 44142 Mason Street Bridge Rehabilitation Br. #238/055

BOW 24223 Bridge Replace Page Road over Bela Brook Br. #065/140

COLEBROOK 40640

Reconstruct approx. 2700' of US 3/Main St & Sidewalks from South Main

St. traffic island to Beaver Brook

*CONWAY 40638

Intersection improvements to NH 16 including intersections of NH 16 with

NH 153 and NH 16 with NH 113

"HANOVER 44015 Multi-use path connecting Reservoir Rd to E. Wheelock St

"HILLSBOROUGH 41368

Construct approximately 4,600 feet of sidewalk along Route 149 from

Edgebrook Road to 77 W. Main.

JAEFREY 42512

Construct and reconstruct sidewalks, crosswalks and bike lanes on

Peterborough St.

KEENE 40653 Bridge Replace George Street over Beaver Brook Br. #142/092

KEENE 43737

Const. 4,100 LF of rail trail from Eastern Avenue to the

Northern side of NH Route 101

LEBANON I3558A Bridge Replace NH 12A over NH RR Bridge# 062/117

LEBANON 24221 Bridge Replace Trues Brook Rd over Blood Brook Br. #066/059

LEBANON 44016 Mechanic Street Sidewalk Project

"LEBANON 40794 Reconstruct Mechanic St / High St / Mascoma St Intersection

MANCHESTER 42881

Construct a northbound right turn lane and modify lane utilization at

Willow St. & Weston Rd Intersection

"NASHUA 41586A

Reconfigure Factory St, West Main St, Pearl St intersection including

signal upgrades (part of larger Oval project)

NEWINGTON 42879

Construct right turn lane on the Northbound direction of New Hampshire

Ave Intersection

ORFORD 41151 Bridge Replace Archertown Rd over lacobs Brook Br.# 080/120

RICHMOND 29055 Bridge Replace Whipple Hill Rd over Roaring Brook Br. #065/083

SALEM 44309 Bridge Replace Bridge St over Spicket River Br. #115/097

SUGAR HILL 24218 Bridge Replace Crane Hill Rd over Gale River Br.# 202/128

WENTWORTH 40648 Bridge Replace -Frescoln Road over Rocky Branch Br. #108/070

"Approved to advertise prior to October of 2025, advertised in fall of 2025 (technically FY26)

Projects no longer showing in the current LPA Annual Report com pared to Last year's report

Project Name Project # Description

BRADFORD 23819 Completed - Bridge Rehab-Bradford Center Rd over Warner River-Br. #140/144

CONCORD 15877 Completed - Bridge Replacement-Hooksett Turnpike over Bela Brook-Br. #200/015

CONCORD 15878 Completed - Bridge Replacement-Birchdale Rd over Bela Brook-Br. #193/027

CONCORD -

PEMBROKE 14841A Completed - Bridge Replace North Pembroke Rd over Soucook River-Br. #183/156

CONWAY 40018 Completed - Reconstruct NH 16 from Olympic Lane east to NH 153 (Four Comers)

HINSDALE 41365 Completed - Construct Sidewalks along Brattleboro Road.

KEENE 40439 Completed - Construet 11,695' of shared lane and bike lane markings and crossing

PORTSMOUTH 42350 Completed - Realign Lang Rd-conneet to Longmeadow Rd

STATEWIDE 16011A Statewide Bicycle Safety Training - Non-Infrastructure - Safe Routes to School

Governor & Executive Council Informational Item - List of LPA Projects

One (1) LPA project list is attached to this report and is sorted alphabetically by municipality.

The following table of definitions below describes the terms used in the alphabetical LPA project list.

Definitions

Ad Year The actual or expected year the project will be advertised for construction bids.

State Ad Year begins July f Federal Ad Year begins October P'

BR# The NHDOT Bridge Number (if bridge project)

Bride-LPA-Rehab-Rcn LPA Large Bridge Rehabilitation or Replacement - Federal funding program

Close Out Status - Project substantially complete and finalizing documentation

CMAO Congestion Mitigation Air Quality - federal funding program

Complete Status - Final voucher closeout process completed this year, will not show on next year's

report

Construction Status - Bids approved and project construction in progress

Current Estimated Cost

($) All Funding

The total cost of the project including Federal funds, municipal matching funds (typically

20%) and other sources of funds (possibly State and/or non-participating funds)

Current Status Current status of project - see individual definitions for Enrolled, Design, Construction, Close

Out, and Complete

Description The location and intent of the project

Design Status - project preparing design documents and permits up to and including advertising for

bids

Ear-NH Designated Earmark to New Hampshire - Federal funding allocation

Enrolled Status - Enrolled in a program with an NFEDOT project number but not activelv incurring

reimbursable expenses.

ER Emergency Relief- federal funding program

Federal-Aid-LPA Federal funding program for local public agency projects

FLAP Federal Lands Access Program

FEMA Federal Emergency Management Agency - federal funding program

Funding Program Name of Federal and/or State Funding Sources in each project

HSIP Highway Safety Improvement - federal funding program

MOBIL Municipally Owned Bridge Bipartisan Infrastructure Law - federal funding program

MOBRR Municipally Owned Bridge Rehabilitation and Replacement - federal funding program

NHCBP National Historic Covered Bridge Preservation - federal funding program

Non-Par Non-participating funds typically at the local level (non-federal and non-state)

Project # The NHDOT project number for each project

Project Name The municipality and/or municipalities where the project is located

Removed Status - project previously enrolled in an NFIDOT program but removed / no longer funded

SBA State Bridge Aid - state funding program

SCENIC Scenic Byways - federal funding program

SFIA State Highway Aid -state funding program

SRTS Safe Routes to School - federal funding program

Substantial Completion

Date

The expected substantial completion year of the project - physical construction is complete

TAP Transportation Alternatives Program - federal funding program

Attachment: NHDOT 2025 Local Public Agency (LPA) Annual Report - Alphabetical List of

Projects

Governor Executive Council • Informational Item NUDOT 2025 Local Public Agency (LPA) Annual Report List of LPA Projects

Ari Ypar Project Name Project# Description Current Status

Substantial Completion

Date LPA Funding Program

^ "1

Currrent Estimate Cost($):

All Funding >•

1 2027 ACWORTH 44523 Replace Forest Rd bridge over Great Brook (Brg#105/035) Design 2029 Bridg-LPA-Rehab-Rcn. SAB S 2,150,000.00

2 2025 ALSTEAD 40649 Bridge Replacement-Hill Road over Darby Brook-Br. #059/134 Construction 2027 MOBIL, SAB $ 1,677,910.00

3 2026 ALSTEAD 40661 Bridge Replacement-Comstock Road over Darby Brook-Br. #046/141 Design 2028 Bridg-LPA-Rehab-Rcn, SAB $ 1,772,679.00

4 2028 ALSTEAD 44388 Replace DREWSVILLE RD Bridge over DARBY BROOK (BR# 058/132) Enrolled 2030 SAB $ 2,133,000.00

5 2023 AMHERST 40654

Bridge Replacement-Mont Vernon Road over Ceasars Brook-Br.

#112/071 Complete 2024 SAB $ 1,074,443.76

6 2024 AMHERST 40657

Bridge Replacement-Thornton Ferry Road over Beaver Brook-Br.

#145/106 Closeout 2025 MOBIL, SAB $ 1,917,124.55

7 2027 AMHERST 42593

Rail Trail between Baboosic Lake Road and Walnut Hill Road, located

on abandoned RR ROW. Design 2029 Federal-Aid-LPA $ 1,020,603.70

8 2030 AMHERST 44351

Construct multimodal facility along N. side of Amherst Street (NH122)

from NHlOl to Courthouse Rd. Enrolled 2032 CMAQ S 1,527,000.00

9 2032 AMHERST 45257

Const. 6,950LF of paved shared use path with 2 spurs to Amherst

Middle School and Souhegan High. Enrolled 2034 TAP s 1,125,000.00

10 2036 AMHERST 44227

intersection improvements @ NH122/Merrimack Rd including bike

and pedestrian accommodations ~1000lf Enrolled 2038 Federal-Aid-LPA s 2,000,000.00

11 2026 ANDOVER 41407

Bridge Replacement-Lawrence Street over Blackwater River-Br.

#098/093 Design 2028 MOBIL, SAB $ 6,800,812.78

12 2035 ANDOVER 44347 Replace Elbow Pond Road Bridge over Mountain Brook (Br#125/129) Enrolled 2037 MOBRR, SAB $ 1,516,000.00

13 2025 ANTRIM 14942 Bridge Replacement -High Street over Great Brook -174/070 {Red List} Construction 2027 SAB $ 2,530,137.00

14 2030 ANTRIM 44330

Replace Liberty Farm Road Bridge over North Branch River

(Br#113/143) Enrolled 2032 MOBRR, SAB $ 1,795,000.00

15 2030 ANTRIM 45260

Safety fmprov. to 8 crosswalks on Main St. Rehab. 200 LF of

conc.sidewalk, const 1500LF sidewalk Enrolled 2032 TAP s 1,616,000.00

16 2026 AUBURN 29316

BRIDGE REHABILITATION-GRIFFIN MILL RD OVER MAPLE FALLS BROOK-

BR. #095/127 Design 2028 Bridg-LPA-Rehab-Rcn, SAB $ 1,247,458.66

17 2023 BARRINGTON 26722

BRIDGE REHABILITATION-GREENHILL RD OVER ISINGLASS RIVER-BR.

#109/162 Closeout 2024 SAB $ ' 2,780,516.96

18 2025 BARRINGTON 41410 Bridge Replacement-Old Settlers Road over Spruce Brook-Br. #052/059 Construction 2026 SAB $ 1,248,187.00

Attachment Fffcctivc October 1, 2025

Governor lixecutive Council - Informational Item NIIDOT 2025 Local Public Agency (LPA) Annual Report List of LPA Projects

# Ad Year Pro|ect Name Project# Description Current Status

Substantial Completion

Date LPA Funding Program

Currrent Estimate Cost($)

All Funding

19 2027 BARTLETT 44433

Bridge Rehabilitation (BR #263/168) on Town Hall Road over East

Branch Saco River. Design 2029 FLAP $ 910,000.00

20 2032 BARTLETT 44336 Replace Foster Street Bridge over Brook (Br#112/098) Enrolled 2034 MOBRR,SAB S 1,683,000.00

21 2025 BEDFORD 21684

Bridge Replacement-Greenfield Parkway over Riddle Brook - Br.

#157/068 Construction 2025 SAB s 2,141,553.61

22 2028 BEDFORD 44617 Rehabilitate or Replace Nashua Rd culvert over Riddle Brook Enrolled 2030 SAB s 1,250,000.00

23 2029 BEDFORD 44296

Construct 3,800' of curbed sidewalk on Old Bedford Rd from NH-101

to Memorial Elem School Design 2031 CMAQ s, 1,070,815.59

24 2032 BEDFORD 44635

Install (4) DCFC disp. with charge rates of 200kW with a peak capac. of

350kW at Hannaford Grocery Enrolled 2034 CMAQ s 897,000.00

25 2025

BEDFORD-

MERRIMACK 24217

BRIDGE REPLACEMENT-BEALS RD OVER BABOOSIC BROOK-BR. #105-

055 Construction 2026 MOBIL, SAB $ 2,939,885.12

26 2035 BELMONT 44346 Replace Union Road Bridge over Durgin Brook (Br#078/132) Enrolled 2037 MOBRR, SAB s 1,909,000.00

27 2022 BERLIN 41367

Const, multi-use path along Androscoggin River from Service Credit

Union Heritage Park to 12th St. Closeout 2023 TAP $ 1,666,750.31

28 2026 BERLIN 44142

Mason Street Bridge (#238/055) Rehabilitation

As identified in CDS 2022 Legislation Design 2028 EAR-NH $ 1,489,577.00

29 2035 BERLIN 43523

NH 16 Roadway improvements from

Cleveland Bridge/Hutchlns Street to Exchange St. Enrolled 2037 Federal-Aid-LPA $ 4,676,270.00

30 2034 BETHLEHEM 45264

Const. 1,500 LF of 5' Bitum. Sidewalk with Ganite Curb. Inst.High

visibility signs and crosswalks Enrolled 2036 TAP $ 845,899.00

31 2026

BETHLEHEM-SUGAR

HILL-FRANCONIA 44160

Design Only - No Construction On-Rd (NH18) & Off-Rd trail

connecting centers of Bethlehem & Franconia. Demo ID: NH097 Design 2028 EAR-NH $ 524,062.50

32 2025 BOW 24223 BRIDGE REPLACEMENT-PAGE RD OVER BELA BROOK-BR. #065/140 Construction 2026 SAB $ 1,782,771.00

33 2027 BOW 24224

BRIDGE REPLACEMENT-RIVER RD OVER BOW BOG BROOK-BR.

#184/127 Design 2029 SAB s 1,750,000.00

34 2034 BRADFORD 45263

Const. 2,400LF of sidewalk along West Main St. From NH Rte 103 to

High St. including crosswalks Enrolled 2036 TAP s 2,262,111.00

35 2022 BROOKLINE 41364

Const. Sidewalks on Rte 130, Const 60 foot Ped bridge over Nissitissit

River and sidewalk to beach Closeout 2024 TAP s 1,989,079.96

36 2024 BROOKLINE 41408 Bridge Rehabilitation-Bond Street over Nissitissit River-Br. #088/074 Complete 2025 SAB s 1,270,332.06

Attachment liffective October 1, 2025

Governor Hxecutive Council - Informational Item NIIDOT 2025 Local Public Agency (LPA) Annual Report List of LPA Projects

Ad Year Proiect Name Proiect # Description Current Status

Substantial Completion

Date LPA Funding Program

Currrent Estimate Cost($)f

All Funding f

37 2026 CANAAN 41399

Potato Road: Bridge Replacement, Br. #147/055. Floodplain Work:

equalizer culvert & roadway work Design 2028 Bridg-LPA-Rehab-Rcn, SAB $ 3,332,031.00

38 2027 CANAAN 41406

Bridge Rehabilitation/Replacement; Gristmill Hill Road over Indian

River-Br, #172/070 Design 2029 Brldg-LPA-Rehab-Rcn, SAB S 5,299,069.00

39 2028 CANAAN 26704

BRIDGE REPLACEMENT-TRANSFER STATION ROAD OVER ORANGE BRK

(#191/080) Design 2030 MOBRR, SAB $ 1,590,000.00

40 2037 CANDIA 44312 Replace Old Deerfield Rd Bridge over Brook (Brg#15l/123) Enrolled 2039 SAB $ 1,289,000.00

41 2030 CENTER HARBOR 45256

Const. 2,325 LF of sidewalk and 3 new crosswalks and associated ADA

components Enrolled 2032 TAP S 972,945.00

42 2032 CHARLESTOWN 44337 Replace Bridge Street Bridge over NECRR (Br#152/053} Enrolled 2034 MOBRR, SAB $ 3,002,000.00

43 2029 CHESTER 44322 Replace Hanson Road Bridge over Exeter River 170/135 Enrolled 2031 MOBRR, SAB $ 2,240,000.00

44 2023 CLAREMONT 41748

Link 10 traffic signals on a two mile stretch of Washington Street from

1st St. to Water St. Closeout 2024 CMAQ s 1,033,777.99

45 2024 CLAREMONT 13248 NH 12 & NORTH STREET INTERSECTION RELOCATION Construction 2026 EAR-NH, Federal-Aid-LPA $ 10,586,124.90

46 2028 CLAREMONT 43726

Const. 1,500LF SW on Broad St., 1,950LF of ped. path at Monadnock

Park, 2,300LFof Rail Trail Design 2030 TAP s. 1,321,300.00

47 2035 CLAREMONT 43530

Roadway Reconstruction (Phase 1) of NH 103 from Citizen to West St.

intersections. Enrolled 2037 Federal-Aid-LPA $ 3,328,870.00

48 2023 COLEBROOK 40652

Bridge Replacement-Bear Rock Road over West Branch (Mohawk

River) Br. #167/120 Closeout 2024 SAB $ 697,035.08

49 2027 GORHAM 43520

NH 16 complete st improvements, from the intersection of US 2

(Lancaster Rd) east to US 2(Glen Rd) Design 2029 EAR-NH, Federal-Aid-LPA $ 1,895,559.81

50 2026 COLEBROOK 40651

Bridge Rehabilitation-Harvey Swell Road over East Branch Mohawk

River-Br. #190/109 Design 2028 SAB s 826,570.00

51 2027 COLEBROOK 40655 Bridge Rehabilitation-Pleasant Street over Mohawk River-Br. #050/099 Design 2029 MOBRR, SAB $ 692,532.00

52 2027 CONCORD 41212

Bridge Rehabilitation and Widening NH9 (Loudon Rd) over Merrimack

River Br. #163/111 Red List Design 2029 Bridg-LPA-Rehab-Rcn, SAB $ 24,127,020.01

53 2027 CONCORD 44368

Purchase TDM software and GTFS support for the commuteSmart

program in New Hampshire Enrolled 2029 CMAQ s 150,000.00

54 2030 CONCORD 44298

Con a roundabout on South St,Clinton St &Broadway and imprvmnts to

nearby inters. Broadway & West Enrolled 2032 CMAQ $ 3,059,815.00

Attachment F.ffective October 1, 2025

Governor lixecutive Council - Informational Item NHDOT 2025 Local Public Agency (LPA) Annual Report List of LPA Projects

1

# Ad Year Project Name Project # Description Current Status

Substantial Completion

Date LPA Funding Program

Currrent Estimate Co5t($)

Ail Funding

55 2032 CONCORD 42614 US3 widening between Garvins Falls Road and Airport Road. Enrolled 2034 Federal-Aid-LPA S 5,101,427.00

56 2032 CONCORD 45252

Design, permit and const, an approx. 0.33-mile boardwalk over

wetlands to connect Greenway Trail Enrolled 2034 TAP $ 4,375,000.00

57 2032 CONCORD 44326 Replace Iron Works Road Bridge over Turkey River (Brtil90/067) Enrolled 2034 SAB $ 2,634,000.00

58 2032 CONCORD 43732

Const. 1.79 miles of 10' wide paved multi-use path between Sewalls

Falls Rd. and Boscawen Town line Enrolled 2034 TAP $ 1,553,928.00

59 2021 CONWAY 41755 Construct 2.8mile pathway parallel to the North-South Road Closeout 2023 CMAQ $ 3,155,808.27

60 2026 CONWAY 40638

Intersection improvements to NH 16 including intersections of NH

16/NH 153 and NH 16/NH 113 Design 2028 Federal-Aid-LPA $ • 6,909,462.84

61 2035 CONWAY 41402

Bridge Rehabilitation-Washington Street over Swift River

Sr. #164/063 Enrolled 2037 MOBRR, SAB $ 2,000,000.00

62 2028 DANBURY 44307

Replace Bohonnon Road Bridge over Wild Meadow Brook

{Br#112/108) Enrolled 2030 MOBRR, SAB s 1,727,000.00

63 2029 DEERFIELD 44311 Replace Blakes Hill Rd Bridge over Lamprey River (Brg#139/127} Enrolled 2031 SAB $ 1,688,000.00

64 2028 DERRY 43736

Const. 1,900 IF of Rail Trail Imp. from the existing Derry Rail Trail to

the Londonderry town line Enrolled 2030 TAP s 865,316.00

65 2026 FRANCESTOWN 42709

Rehabilitation/replacement of bridge Old County Rd N over Collins

Brook Br No-091/142 Design 2028 Bridg-LPA-Rehab-Rcn, SAB $ 1,975,007.00

66 2036 DORCHESTER 42091 Bridge Replacement-Province Road over Bucks Brook-Br #151/055 Enrolled 2038 MOBRR, SAB s 1,151,696.00

67 2027 DOVER 41373 Construct multi-use path from Knox Marsh Rd. to Bellamy Rd. Design 2029 TAP s * 666,936.80

68 2030 DOVER 44350

Improvements along Rte. 108 including traffic signals,safety, improved

traffic flow Enrolled 2032 CMAQ s 3,600,000.00

69 2030 DOVER 42626 Pedestrian and accessibility improvements. Enrolled 2032 Federal-Aid-LPA $ 231,622.25

70 2026 DOVER 44159

Complete Streets reconstructionon on NH108 between Stark Ave and

Silver St. Design 2028 EAR-NH $ 5,424,300.87

71 2030 DURHAM 44349

Upgrade 4-way-inters, to improve service,safety&reduce wait times

with road redesign or roundabout Enrolled 2032 CMAQ $ 3,410,000.00

72 2033 DURHAM 45261

Reconst. a segment of Madbury ROad to include a paved multi-use

path along one side with corsswalks Enrolled 2035 TAP $ 1,532,000,00

Attachment P.ffective October 1,2025

Governor lixecutive Council - Informational Item NHDOT 2025 Local Public Agency (LPA) Annual Report List of LPA Projects

# Ad Year Project Name Project U Description Current Status

Substantial Completion

Date LPA Funding Program

Currrent Estimate Cost($)

All Funding

73 2034 DURHAM 44344 Replace Mill Road Bridge over Oyster River (Br# 097/109) Enrolled 2036 MOBRR, SAB $ 2,821,000.00

74 2037 EFFINGHAM 44333 Replace Granite Rd Bridge over South River (Brg#166/082) Enrolled 2039 MOBRR, SAB S 2,134,000.00

75 2025 ENFIELD 44286

Design/permit a multi-use path along NH4A and expanding parking

with adjacent sidewalk on Main St (No Construction Funding) Design 2026 SCENIC S 200,000.00

76 2027 ENFIELD 13592 Replace Shaker Blvd Bridge over Knox River (Brg #120/115} Design 2029 MOBIL, SAB S 2,511,519.06

77 2033 ENFIELD 45255

Const. 4850 LF of stone dust trail along NH Route 4A and build 550 ft

of parking along Main St. Enrolled 2035 TAP S 1,912,900.00

78 2023 EXETER 40436

Widen shoulders to 5' on Kingston Road {NH Route 111) for

approximately 1.1 miles. (14-26TAP) Closeout 2025 TAP, HSIP $ 1,816,684.37

79 2030 EXETER 45254

Const. 1,245 LF of Sidewalk, 5' wide to create safer and accessible

pedestrian access. Enrolled 2032 TAP $ 735,305.00

80 2032 EXETER 44624 Install (2) electric vehicle DC fast charging stations at 158 Epping Road Enrolled 2034 CMAQ $ 400,000.00

81 2032 FARMINGTON 45258

Install 2 RRFB in the downton area. Reconstruct 2,100 LF of sidewalk

from Canal St. to Paulson Rd. Enrolled 2034 TAP s 897,000.00

82 2032 FARMINGTON 43550

Sidewalk improvements along Main Street and Elm Street to expand

connected network Enrolled 2034 Federal-Aid-LPA $ 580,379.69

83 2033 FARMINGTON 44391 Replace Spring Street Bridge over Cocheco River (Br #076/135) Enrolled 2035 MOBRR, SAB $ ' 2,497,000.00

84 2027 FITZWILLIAM 44290 Replace Templeton Turnpike Bridge over Priest Brook (Bridge 147/080) Design 2029 EAR-NH, MOBRR, SAB s 2,414,765.47

85 2026 HARRISVILLE 16114 Bridge Replacement-South Rd over Minnewawa Brook-Br. #061/060 Design 2028 Bridg-LPA-Rehab-Rcn, SAB $ 1,083,862.00

86 2033 FRANCONIA 44623

Install 2 two-port electric vehicle charging stations in the center of

town on Main Street (Rte 18) Enrolled 2035 CMAQ $ 46,000.00

87 2028 FRANKLIN 42513

Construct a pedestrian walkway on the existing Trestle Bridge to

connect to Mill City Park Trail Design 2030 TAP $ 4,866,000.00

88 2024 FREMONT 23793 Bridge Replacement-Martin Rd. over Piscassic River-Br. #155/133 Closeout 2025 SAB s 1,269,350.27

89 2034 GILSUM 44538 Replace Banks Road Bridge #097/139 over Hayward Brook Enrolled 2036 MOBRR, SAB $ 1,223,000.00

90 2027 NASHUA 41586

Safety, capacity and multimodal access improvements to the Walnut

Street Oval intersection Design 2029 EAR-NH, Federal-Aid-LPA $ 5,145,000.00

Attachment F.ffective October 1, 2025

Governor lixecutive Council - Informational Item NIIDOT 2025 Local Public Agency (LPA) Annual Report List of LPA Projects

^cLYear.^ Proiect Nam#» PtoiectJ^. D^t^iption Current^tatus

Substantial Completion

Date LPA.Fundlng?rogram. „

Currrent Estimate Cost($)

All Funding,

91 2027 GORHAM 43842

Sidewalk and ped crossing improvements, beginning west of NH 16/US

2 travelling west on US Rte 2 Design 2029 TAP S 1,710,000.00

92 2035 GORHAM 44216

NH16, Construct "1,5 Miles sidewalk & bike shoulder from "1/2 mile

of US 2 to "1400 S of Pisani St. Enrolled 2037 Federal-Aid-LPA S 4,369,000.00

93 2029 GOSHEN 44306 Replace Ball Park Road Bridge over Trow Brook (Bridge#082/083) Enrolled 2031 SAB S 1,330,000.00

94 2031 GRANTHAM 44318 Replace Olde Farms Road bridge over Sawyer Brook (Br#083/108) Enrolled 2033 SAB $ 1,149,000.00

95 2029 GREENFIELD 44301 Replace School House Rd Bridge over Brook (BrS151/089) Enrolled 2031 SAB S 1,310,000.00

96 2029 HAMPTON 42606 Complete Streets Improvements on Winnacunnet Road. Enrolled 2031 Federal-Aid-LPA S 1,141,091.86

97 2026 HANOVER 44015

Multi-use path connecting Reservoir Rd to south - As identified in CDS

2022 Legislation Design 2028 EAR-NH $ 762,029.10

98 2024 MANCHESTER 24212

Amoskeg East Bnd ■ SALMON ST OVER RD,RR,& RIVER (Brg#107/072)

and Adjacent Ramp "E" (Brg#107/071) Construction 2026 Bridg-LPA-Rehab-Rcn, SAB $ 22,381,899.00

99 2035 HILL 44340 Replace Shop Road Bridge over Needle Shop Brook {Br#171/105) Enrolled 2037 MOBRR, SAB S 1,989,000.00

100 2026 HILLSBOROUGH 41368

Construct approximately 4,600 feet of sidewalk along Route 149 from

Edgebrook Road to 77 W. Main. Design 2028 TAP S 2,722,518.00

101 2028 HILLSBOROUGH 44305 Replace Bog Road Bridge over Sand Brook (Brg#154/113) Enrolled 2030 MOBRR, SAB S 1,957,000.00

102 2028 HOOKSETT 43851 Reconstruct 2 intersections; 3A / Hackett Hill and 3A / Main St Design 203O Federal-Aid-LPA, MOBRR, SAH s 10,851,982.97

103 2033 HOOKSETT 44627

Install DCFC public access EV charging infrastructure at Its strategic

location off I-93& Rte.3 Enrolled 2035 CMAQ s 500,000.00

104 2023 HUDSON 41754 Constructing a third southbound right turn lane on Lowell Rd/NH 3A Closeout 2024 CMAQ s 2,064,226.50

105 2024 HUDSON 44653 Bridge Replacement of BR #114/083 on Melendy Road over First Brook Closeout 2026 MOBRR $ 1,448,866.65

106 2034 HUDSON 44228

Cnstruct ped imprvs inc "7,455lf sidwik to elim gaps RRFBs & drain

imprvs btwn "Ledge & Alvirne Rds Enrolled 2036 Federal-Aid-LPA $ 2,565,000.00

107 2024 JACKSON 40808

Bridge Rehabilitation/Replacement - Valley Cross Rd over Wildcat

Brook-Br. #153/066 Closeout 2025 SAB $ 2,507,559.37

108 2032 JACKSON 44319 Replace Dundee Road bridge over Mill Brook (BR #198/046) Enrolled 2034 SAB $ 1,474,000.00

Attachment l'*frective October 1, 2025

Governor Kxecutive Council - Informational Item NIIDOT 2025 Local Public Agency (LPA) Annual Report List of LPA Projects

Ad Year Project Name Project # Description Current Status

Substantial Completion

Date LPA Funding Program

Currrent Estimate Cost($)

All Funding

109 2023 JAFFREY 41401

Bridge Rehabilitation-Nutting Road over Contoocook River-Br.

#159/094 Complete 2024 SAB $ 1,510,654.04

110 2025 JAFFREY 42512

Construct and reconstruct sidewalks, crosswalks and bike lanes on

Peterborough St. Design 2027 TAP $ 1,864,907.00

111 2034 JEFFERSON 44341

Replace Larconnb Road Bridge over Israel River Overflow

(Br#104/078) Enrolled 2036 MOBRR, SAB $ 2,877,000.00

112 2021 KEENE 10309B

Reconst. of Winchester {NH 101 to Pearl & Island including Key Rd

intersection) and Br. No. 125/069 Closeout 2024 Federal-Aid-LPA, MOBRR $ 10,528,821.74

113 2024 KEENE 42515 Improve. Marlboro St. and construct trait to Cheshire Rail Trail Construction 2026 TAP S 2,527,364.03

114 2025 KEENE 40653 Bridge Replacement-George Street over Beaver Brook-Br. #142/092 Design 2026 MOBRR, SAB $ 3,040,000.00

115 2025 KEENE 43737

Const. 4,100 LF of rail trail from Eastern Avenue to the

Northern side of NH Route 101. Design 2026 EAR-NH, TAP $ 1,948,992.57

116 2031 KEENE 45251

Cheshire Rail Trail Install bridge over Rt. 101 in Keene. Install railings

on Stone Arch Bridge. Enrolled 2033 TAP S 2,557,300.00

117 2031 KEENE 44329 Replace Maple Avenue Bridge over Black Brook (Br#090/101) Enrolled 2033 MOBRR, SAB $ 1,731,000.00

118 2033 KEENE 43543

Corridor improvements to West St. from intersection of NH 9/10/12 to

School Street Enrolled 2035 Federal-Aid-LPA $ 5,200,000.00

119 2028 MANCHESTER 24206

BRIDGE REHAB-SALMON ST WB OVER RD. BMRR, MERRIMACK RIVER,

RAMP-BR. #106/072 Enrolled 2030 Bridg-LPA-Rehab-Rcn, SAB S 17,005,600.00

120 2036 MERRiMACK 44339

Rehabilitate/Restore Historic US 3 Bridge over Souhegan River

{Br#116/120) Enrolled 2038 Bridg-LPA-Rehab-Rcn, SAB S * 3,000,000.00

121 2026 LACONIA 43845

Replace US-3 / Weirs Blvd red-listed bridge over Langley Brk

(#135/128) incid Roadway improvements Design 2028 SAB $ 3,025,000.00

122 2028 LACONIA 24181

BRG Rehab/Replac,Centenary Ave #126/163-red list over NH RR

(845/467K).Ownership transfer to city Design 2030 MOBRR $ 2,334,950.00

123 2029 LACONIA 43731

Const. 4,300LF of sidewalk on Elm St. and 8' wide Mulit-use path on

the other side of Elm St. Design 2031 TAP $ 4,197,378.00

124 2034 LACONIA 44217

Rehab Union Ave from Main St to Gilford Ave ("S.OOO") including

bike/ped, ADA & stormwater improves Enrolled 2036 Federal-Aid-LPA $ 3,410,000.00

125 2028 LANCASTER 22192

Mount Orne Road over Connecticut River; Mount Orne Covered Bridge

#039/105 Enrolled 2030 SAB $ 350,000.00

126 2034 LANCASTER 44342 Replace McGary Hill Road Bridge over Bone Brook (Br#218/076) Enrolled 2036 MOBRR, SAB $ 1,755,000.00

Attachment F.ffective October 1, 2025

Governor Executive Council • Informational Item NIIDOT 2025 Local Public Agency (LPA) Annual Report List of LPA Projects

1 # Ad Year Project Name Project # Description Current Status

Substantial Completion

Date LPA Funding Program

Currrent Estimate Cost($)

All Funding

127 2024 LEBANON 41366

Construct bicycle and pedestrian improvements along Lahaye Dr from

NH Rte 120 to Mount Support Rd Closeout 2026 TAP $ 1,167,200.03

128 2027 WEARE 14338

Bridge Replacement-River Road Bridge over Piscataquog River - Br.

#110/150 Design 2029 Bridg-LPA-Rehab-Rcn, SAB $ 4,162,000.00

129 2025 LEBANON 24221

BRIDGE REPLACEMENT-TRUES BROOK RD OVER BLOODS BROOK-BR.

#066/059 Construction 2026 MOBIL, SAB S 5,419,006.75

130 2025 LEBANON 44016

Mechanic Street Sidewalk Project- As identified in CDS 2022

Legislature Construction 2026 EAR-NH $ 593,824.07

131 2026 LEBANON 40794 Reconstruct Mechanic St / High St / Mascoma St Intersection Design 2028 Federal-Aid-LPA s 4,876,327.47

132 2026 LEBANON 24222 BRIDGE REHABILITATION; NH 120 OVER NHRR (ABD)-BR. #121/117 Design 2028 MOBRR, SAB s 2,873,470.00

133 2029 LEBANON 44353

Extend bike/ped path 1.3mi from current terminus at Glen Rd

westward to sidewalk network on Rtl2A Enrolled 2031 CMAQ s * 2,400,000.00

134 2030 LEBANON 45239

Construct 2,160 LF of asph. sidewalk, with ADA components, on US

Route 4 adjacent to downtown Enrolled 2032 TAP s 2,143,005,00

135 2034 LEBANON 42604 Intersection Improvement at Mechanic Street and Slayton Hill Road Enrolled 2036 Federal-Aid-LPA $ 4,155,682.00

136 2036 LEBANON 44234

Complete St. imprvs to Hanover St. from NH120 to High St ("140011}

inc bk Ins/sdwiks/intrsct improv Enrolled 2038 Federal-Aid-LPA $ 4,456,073.00

137 2024 LITTLETON 41362

Const sidewalks along Cottage St, Mill St. South St, Meadow St, Mt.

Eustis Rd, Bronson St Construction 2026 TAP $ 1,933,224.80

138 2027 LITTLETON 44869 Littleton Downtown Reconnect Planning Study Enrolled 2029 EAR-NH, SAH $ 456,250.00

139 2027 LITTLETON 40884

Reconstruct intersection of US-302 (Meadow St), Bridge Street, and

Saranac St - safety improvement Enrolled 2029 SAH $ 300,000.00

140 2030 LITTLETON 43844

Pedestrian improvements along Route 302 from near Old County Rd to

near Lowe's Enrolled 2032 Federal-Aid-LPA s, 4,068,560.00

141 2027 LONDONDERRY 42508

Construct a 1 mile multi-use path along the side of Harvey Rd. Webster

Rd, and Grenier Field Rd. Design 2029 TAP $ 2,269,995.00

142 2028 LONDONDERRY 44361

Const. 2,580 LF of multi-use path to complete the last phase (Phase

7)of the Londonderry Rail Trail Enrolled 2030 CMAQ $ 527,990.00

143 2030 LONDONDERRY 44537 Replace Stokes Hill Road Bridge #077/151 over Little Cohas Brook Enrolled 2032 SAB s 1,293,000.00

144 2033 LONDONDERRY 44632

lnstall(2) electric vehicle DC fast charging stations at our planned

convenience store/fueling site Enrolled 2035 CMAQ s 400,000.00

Attachment Effective October 1, 2025

Governor lixecutive Council ♦ Informational Item NHDOT 2025 Local Public Agency (LPA) Annual Report List of LPA Projects

Ari Ypar Prolpft Name project!# Description Current Status

Substantial Completion

Date LPA Funding Program

*

Currrent Estimate Cost($)l

All Funding %

145 2036 LOUDON 44313 Replace Wales Bridge Rd Bridge over Soucook River (Brg#054/065) Enrolled 2038 MOBRR, SAB S 4,840,000.00

146 2037 LYME 44328 Replace Pinnacle Rd Bridge overTrout Brook (Brg##113/147) Enrolled 2039 MOBRR, SAB $ ' 1,734,000.00

147 2026 MADBURY 41462 Bridge Replacement-Fedshet Road over Johnson Creek-Br. ##160/086 Design 2028 SAB S 1,527,063.00

148 2020 MANCHESTER 28336

BRIDGE REHABILITATION-QUEEN CITY BR. OVER 1-293, BMRR &

MERRIMACK RIVER-BR. ##151/065 Closeout 2022 SAB S 9,413,747.85

149 2022 MANCHESTER 29811

Construct Multi-use path along the abandoned rail corridor from Gold

St. to Perimeter Road Closeout 2024 CMAQ $ 3,605,402.35

150 2022 MANCHESTER 41747

Implement an Adaptive Signal Control system on Granite St &Upgrade

So. Willow St.signal performance Closeout 2024 CMAQ HSIP $ 2,015,038.00

151 2024 WEBSTER 40810

Bridge Replacement-Clothespin BR Rd over Blackwater River-

Brffl21/103 & widening fishing access area Construction 2026 Bridg-LPA-Rehab-Rcn, SAB $ 3,844,975.30

152 2024 MANCHESTER 40428

Construct multi-use path along Baker St, Brown Ave, Dubisz St, and

Sundial Ave. (14-25TAP) Closeout 2025 TAP $ 1,584,264.00

153 2025 MANCHESTER 42881

Construct a northbound right turn lane and modify lane utilization at

Willow St. & Weston Rd Inter. Design 2026 CMAQ $, 1,511,646.39

154 2027 MANCHESTER 44857 Downtown Pedestrian Infrastrucure Improvements Design 2029 EAR-NH s 1,821,270.18

155 2027 MANCHESTER 42509

Const. ADA compliant pedestrian bicycle trail along Perimeter Rd.,

South Willow St. and Harvey Rd. Design 2029 TAP $ 1,155,923.00

156 2027 MANCHESTER 42886

NHDOT Direct Managed LPA Roundabout at River Rd and Bicentennial

Drive - Derryfield School Design 2029 CMAQ $3,473,000.00

157 2025 LEBANON 13558A

NH 12A Bridge Replacement over State of NH RR; Bridge# 062/117

{MOBRR-221) Design 2028 BrIdg-LPA-Rehab-Rcn, MOBRR. SAB $ 16,563,360.44

158 2029 MANCHESTER 15837 Bridge Rehabilitation-US 3 (Elm St) over B&MRR-Br, #144/075 Enrolled 2031 MOBRR, SAB $ 5,635,000.00

159 2030 MANCHESTER 43730 Const. 4,800 LF of multi-use path along Canal Street. Enrolled 2032 TAP $ 1,311,042.00

160 2031 MANCHESTER 44352

Signal work,Con Turn Lanes, sidewalk repair to a 1.7mi section

between Bridge St-Cilley Rd/Huse Rd. Enrolled 2033 CMAQ $ 3,000,000.00

161 2033 MANCHESTER 45253

Const, multi-modal Improv. Traffic calming and safety enhancement

adjacent to Livingston Park. Enrolled 2035 TAP $ 2,550,000.00

162 2028 MEREDITH 44285

Widen NH Route 25 for left and right turn lanes at the Laker Lane Int.

Replace 1050 LF sidewalk. Enrolled 2030 CMAQ $ 1,346,963.60

Attachment Ivffective October 1, 2025

Governor lixecutivc Council - Informational Item NIIDOT 2025 Local Public Agency (LPA) Annual Report List of LPA Projects

\ » Ad Year Project Name Project# Description Current Status

Substantial Completion

Date LPA Funding Program

Currrent Estimate Cost($)

All Funding

163 2023 MERRIMACK 40300

Construct pedestrian trail in the town of Merrimack for approximatiy

700LF. (14-15TAP} Closeout 2024 TAP, HSIP S 2,281.238.68

164 2026 MERRiMACK 29174

BRIDGE REPLACEMENT US-3 OVER BABOOSIC BRK (BR# 118/135) &

Reconstruct Wire Rd / US-3 Intersection Design 2028 Federal-Aid-LPA, MOBRR, SAB S 12,780,285.00

165 2030 MERRIMACK 43733

Const. 3,600 LF of sidewalk along US3 from Chamberlain Bridge to

Merrimack 360 plaza. Enrolled 2032 TAP S 1,320,980.00

166 2032 MERRIMACK 43541

Rehab Souhegan Rail Trail pedestrian bridge (Brg #112/115) over

Souhegan River adjacent to F£ TPK Enrolled 2034 Federal-Aid-LPA $ 995,000.00

167 2033 MERRIMACK 45259

Const. 1,600 LF of 5' paved sidewalk with Granite curbing. 2 ADA

Crosswalks with signals Enrolled 2035 TAP $ 1,476,391.00

168 2035 MERRIMACK 44230

Intersection re-alignment @ Naticook Lake & Camp Sargent Rds.

^1,000LF. Enrolled 2037 Federal-Aid-LPA s 1,000,000.00

169 2024 LACONIA 26706

BRIDGE REPLACEMENT-ACADEMY ST OVER DURKEE BROOK-BR.

#121/037 Closeout 2026 Bridg-LPA-Rehab-Rcn, MOBIL, SAB $ 1,300,321.69

170 2024 MILFORD 43115

BRIDGE REPLACEMENT-MASON ROAD OVER GREAT BROOK -

BR# 089/106 Closeout 2025 SAB $ 1,378,747.48

171 2027 MILFORD 42470

Improvements to the "Oval" to improve traffic flow (Secl702 - Demo

id NH038& NH058] Design 2029 Federal-Aid-LPA $ 2,199,948.00

172 2028 MILFORD 41587 NHDOT Direct Managed LPA - Pedestrian Swing Bridge Rehabilition Design 2030 Federal-Aid-LPA s 939,070.00

173 2033 MILFORD 44335 Replace Hartshorn Road Bridge over Hartshorn Brook {Br#103/163) Enrolled 2035 SAB $ 1,475,000.00

174 2028 MILTON 44310 Replace Winding Road Bridge over Lyman Brook (Brg#190/101) Design 2030 MOBRR, SAB $ 1,485,700.00

175 2031 MILTON 43551 Construct sidewalks along Silver & Dawson Streets. Enrolled 2033 Federal-Aid-LPA $ 573,834.00

176 2036

MILTON NH - ACTON

MAINE 44393

Replace the Church St bridge over Salmon Falls River Brg#077/163

"Ben Brackett" Brg Maine DOT lead Enrolled 2038 MOBRR. SAB s 3,910,000.00

177 2023 NASHUA 44141 To provide ADA Accessibility to the Cotton Mill Transfer Bridge. Closeout 2024 EAR-NH, HSIP $. 1,656,749.16

178 2024 NASHUA 43509

Installation of RRFB's, crosswalk visibility enhancemets at vaious

streets along Main St.(A!D) Construction 2026 Federal-Aid-LPA $ 672,930.00

179 2026 NASHUA 41586A

Reconfig Factory St /W.Main St / Pearl St intersection including signal

upgrades (part of Oval prj) Design 2028 EAR-NH $ 500,000.00

180 2026 NASHUA 16314

Intersection improvements at East Hollis St and Bridge St from C St to

the Hudson Town Line. Design 2028 Federal-Aid-LPA $ 4,837,596.90

Attachment l'"ffective October 1, 2025

Governor lixecutive Council - Informational Item NHDOT 2025 Local Public Agency (LPA) Annual Report List of LPA Projects

# Ad Year Project Name Project # Description Current Status

Substantial Completion

Date LPA Funding Program

i

Currrent Estimate Cost($)^

All Funding |

181 2026 NASHUA 41742

Construct the Heritage Rail Trail East from Main St. to E. Hollis/Denton

intersect ("^.Tm) Design 2028 CMAQ $ 2,083,260.00

182 2027 NEW CASTLE 42517

Construct bicycle shoulders and sw along Wentworth Rd, NH IB from

Beach Hill Rd. To Neals Pit Ln Design 2029 Federal-Ald-LPA, TAP $ 797,005.00

183 2027 NASHUA 42516

Upgrade sidewalks to ADA standards and create bicycle lanes on Lock

Street and Whitney Street. Design 2029 TAP $ 1,116,976.00

184 2027 NASHUA 44870

Design a new pedestrian bridge over the Nashua River adjacent to the

existing bridge. Enrolled 2029 EAR-NH $ 613,409.96

185 2028 NASHUA 44354

Traffic signal phasing and timing.Replace underground traffic

detection loops to reduce congestion Enrolled 2030 CMAQ $ 2,750,000.00

186 2029 NASHUA 43727

Const. 10' multi-use path & Const, path linking the Nashua Riverwalk

to Nashua Heritage Trail Enrolled 2031 TAP $ 1,329,979.00

187 2029 NASHUA 41585

DW Highway pedestrian safety improvements from S/L to Stetson St.

{-2.2m) Enrolled 2031 Federal-Aid-LPA $ 483,718.00

188 2030 NASHUA 42595

Ped/Blke/ADA improvements on Kinsley St {NH 111) from Dunstable

Rd to Main St Enrolled 2032 Federal-Ald-LPA S 1,733,180.00

189 2032 NASHUA 44620

Install 4 Electric Vehicle-Direct Current Fast Char^ing{DCFC) stations 2

units with 4 total.CMAQ Enrolled 2034 CMAQ $ 605,000.00

190 2032 NASHUA 43542 Various bus shelter Improvements within NTS service area. Enrolled 2034 Federal-Ald-LPA s • 501,900.00

191 2034 NASHUA 45262

Const. 3,000 LF sidewalk along Ridge Rd. / Middle Dunstable Rd. from

Pine Brook Rd. to Searles Rd. Enrolled 2036 TAP $ 1,200,000.00

192 2034 NASHUA 42717

Construct a new access road to connect Veteran's Memorial Parkway

to Franklin St Enrolled 2036 Federal-Aid-LPA $ 1,112,563.00

193 2035 NASHUA 40660

Bike/pedestrian/safety Improvements to East HoHls Street from Main

St east to C Street. {".Sm) Enrolled 2037 Federal-Aid-LPA $ 4,343,802.19

194 2035 NASHUA 42882

intersection & Roadway Improvements at the Canal St/Franklln

St/MaIn St Intersection. Enrolled 2037 CMAQ s 1,770,700.00

195 2035 NASHUA 43545

Study and implement Complete Streets improvements on Canal St

from RR Square to Taylors Falls Brdg Enrolled 2037 Federal-Aid-LPA $ 1,550,000.00

196 2023 NASHUA HUDSON 42596

Bridge Rehabilitation of 2 bridges owned by both Nashua & Hudson.

BR #110/068 & 109/068, Construction 2025 MOBRR s 3,024,026.61

197 2028 NELSON 44293 Replace Old Stoddard Road Bridge over Bailey Brook (Brdg#142/126) Enrolled 2030 SAB $ ' 1,569,000.00

198 2027 NEW BOSTON 14771

Bridge Replacement Gregg Mill Rd over South Branch Piscataquog

River-Br. #132/138 Design 2029 MOBIL, SAB s 3,040,434.00

Attachment Page II of 16 l-'ffective October 1, 2025

Governor Ivxccutive Council - Informational Item NIIDOT 2025 Local Public Agency {!.PA) Annual Report List of LPA Projects

? # Ad Year Project Name Project U Description Current Status

Substantial Completion

Date LPA Funding Prosram

Currrent Estimate Co$t($)

All Funding

199 2027 NEW BOSTON 15505

Bridge Replacement-Tucker Mill Road over Mid Br. Piscataquog-Br.

#087/150 Design 2029 MOBIL, SAB S 2,957,311.00

200 2025 COLEBROOK 40640

Reconst. approx. 2700' of US 3/Main St & Sidewalks from South Main

St. traffic island to Beaver Brk Design 2027 Federat-Aid-LPA, TAP $ 7,163,122.00

201 2031 NEW IPSWICH 44332

Replace Taylor Road Bridge over West Brook Souhegan River

{Br#108/070) Enrolled 2033 SAB S 1,633,000.00

202 2025 NEWINGTON 42879

Construct right turn lane on the Northbound direction of New

Hampshire Ave Intersection Construction 2025 CMAa Federal-Aid-LPA $ 682,892.00

203 2028 NEWPORT 43738 Reconstruct Sidewalks along NH Route 11/103 (Sunapee Street) Enrolled 2030 TAP $. 815,284.05

204 2028 NEWPORT 44360

Const, a Park & Ride lot for motor vehicles commuting and otherwise

traveling to and from Newport Enrolled 2030 CMAQ $ 550,614.00

205 2028 NEWTON 44287 Replace Witders Grove Rd bridge over Country Pond (Brg#053/105) Enrolled 2030 MOBRR, SAB $ 981,000.00

206 2028 NHDES 42875

Purch & instil 3 EV charging stations, 2 Concord {Fruit St/Hazen Dr) & 1

in Franc. Notch (CMSP) Enrolled 2030 CMAQ $ 239,730.00

207 2027 NORTHUMBERLAND 42510

Ren/rep approx 6000 LF of Sdwik & ped facil along US RT3 in Groveton

along Main/ State/ Church St. Design 2029 Federal-Aid-LPA, TAP $ 2,448,000.00

208 2034 ORANGE 44321 Replace Brock Hill Road Bridge over Brown Brook {BR#107/046) Enrolled 2036 SAB s 1,524,000.00

209 2025 ORFORD 41151

Bridge Replacement -Archertown Road over Jacobs Brook-Br, No.

080/120 Design 2026 SAB s 2,456,000.00

210 2031 ORFORD 44324 Replace High Bridge Road Bridge over Archertown Brook (Br#087/108) Enrolled 2033 MOBRR, SAB s 2,133,000.00

211 2021 OSSIPEE 23818

Bridge Rehabilitation-Nudd Rd over Bearcamp River-Bridge #108/333-

Phase ll-Whittier Covered Bridge Closeout 2023 MOBRR, NHCBP S 1,784,231.25

212 2024 PELHAM 41751

Intersection improvements at the intersection of NH128 & Sherburne

Rd Construction 2026 CMAQ s 2,522,402.92

213 2026 PELHAM 29450

BRIDGE REHABILITATION-OLD BRIDGE ST OVER BEAVER BROOK-BR.

#109/081 Design 2028 MOBRR, SAB s 3,249,354.00

214 2026 PELHAM 41751A

Intersection Improvements (roundabout) at Mammoth (NH 128) and

Marsh Rd (NHlllA) Design 2028 CMAQ, Federal-Aid-LPA s 3,140,000.00

215 2019 PETERBOROUGH 14772A

RECONSTRUCT US ROUTE 202 (® MAIN STREET INTERSECTION

INCLUDING BOULDER RETAINING WALL STABILIZATION Closeout 2024 Federal-Aid-LPA $ 9,324,169.98

216 2019 PETERBOROUGH 14933

MAIN STREET BRIDGE REPLACEMENT OVER CONTOOCOOK RIVER -

092/089 (Red List) Closeout 2024 MOBRR, SAB $ 7,773,428.28

Attachment 'I'lffective October 1, 2025

Governor llxecuiive Council - Informational Item NHDOT 2025 Local Public Agency (LPA) Annual Report List of LPA Projects

# Ad Year Project Name Project# Description Current Status

Substantial Completion

Date LPA Funding Program

Currrent Estimate Cost($)*

All Funding l

217 2028 PITTSFiELD 14972

BRIDGE REPLACEMENT OVER KELLY BROOK Bridge number 089/135

Design 2030 SAB $ 1,166,469.00

218 2027 PLYMOUTH 41583

Intersection and sidewalk improvements to Highland Street at and in

the vicinity of Reservoir Road Design 2029 Federal-Aid-LPA $ 2,303,480.00

219 2033 PLYMOUTH 44637

Install (2) DCFC dispensers with charge rates up to 350kW at the

Common Man Restaurant Enrolled 2035 CMAQ $ 1,245,535.00

220 2026 PORTSMOUTH 20258

Const, new sidewalk and striped bicycle shoulders and associated

drainage along Peverly Hill Road. Design 2028 CMAa Federal-Aid-LPA S 8,182,200.00

221 2027 PORTSMOUTH 41752

Add a multi-use path for bike/ped along Elwyn Rd extending from Rtl

to Harding Rd. Design 2029 CMAQ $ 1,411,339.00

222 2028 PORTSMOUTH 44386 Replace Cate Street bridge over Hodgson Brook {8r#198/107) Enrolled 2030 MOBRR, SAB $ 2,130,000.00

223 2028 PORTSMOUTH 42874

Purchse & install 8 e-charging stations for EVs (2 @ Pease Tradeprt

2@Pease GC 4 @ Pease Airprt) Enrolled 2030 CMAQ $ 51,260.00

224 2029 PORTSMOUTH 42608 Market St / Russell St Intersection Improvements Enrolled 2031 Federal-Aid-LPA $, 1,298,000.00

225 2030 PORTSMOUTH 42611

Intersection improvements on Grafton Drive by Portsmouth

Transportation Center & Pease Golf Course Enrolled 2032 Federal-Aid-LPA $ 558,396.00

226 2030 PORTSMOUTH 42612

Signalization of Intersection - International Drive / Manchester Square

/ Corporate Drive Enrolled 2032 Federal-Aid-LPA $ 335,038.00

227 2031 PORTSMOUTH 44358

Improvements to US 1 Bypass at the intersection of US 1

Bypass/Coakley/Cottage to reduce emissions Enrolled 2033 CMAQ $ 2,200,000.00

228 2033 PORTSMOUTH 44636

Install (2) DCFC dispensers with charge rates up to 200kW at Market

Basket Grocery Store Enrolled 2035 CMAQ S 797,000.00

229 2032 RAYMOND 44630

Install 3 ChargePoint electric vehicle DC fast chargers close to high

volume corridors Enrolled 2034 CMAQ S 477,450.00

230 2023 RICHMOND 29056

BRIDGE Replacment-TULLY BROOK RD OVER TULLY BROOK-BR.

#155/066 Complete 2024 SAB $ 2,310,154.63

231 2025 RICHMOND 29055

BRIDGE REPLACEMENT-WHIPPLE HILL RD OVER ROARING BROOK-BR.

#065/083 Design 2026 SAB $ 3,161,396.00

232 2022 ROCHESTER 14350

INTERSECTION IMPROVEMENTS TO IMPROVE SAFETY THROUGH

STRAFFORD Sa NORTH MAIN, & WASHINGTON ST Closeout 2024 Federal-Aid-LPA $ 8,324,790.94

233 2026 ROCHESTER 43491 Tebbetts Rd intersection safety improvements at Old Dover Rd Design 2028 HSIP $ 1,565,000.00

234 2027 ROCHESTER 43552

Widen "3,450' from north of Spldg Tpk ramp to Toyota entrance, add

signal and sidewalk. Design 2029 Federal-Aid-LPA $ 8,527,240.27

Attachment HfTective October 1, 2025

Governor Executive Council - Informational Item NHDOT 2025 Local Public Agency (LPA) Annual Report List of LPA Projects

i.._Ad,Year Project Name Project# Description Current Status

Substantial Completion

Date LPA Funding Program

Currrent Estimate Cost($)

All Funding

235 2028 ROCHESTER 43728

Construct new ADA compliant sidewalk along Portland St from

Prospect Street to Salmon Falls Design 2030 TAP $ 3,297,143.93

236 2030 ROCHESTER 42625

Intersection Improvements-Reassessment of turning lane

alignment&vehicle access. Update sidewalk. Enrolled 2032 Federal-Aid-LPA $ 2,596,543.00

237 2030 ROLLINSFORO 44303 Replace Old Mill Lane Bridge over Rollins Brook (Brg #090/052) Enrolled 2032 SAB $ 1,865,000.00

238 2024 RUMNEY 27162 BRIDGE REPLACEMENT-BUFFALO RD OVER BROOK-BR. #093/082 Closeout 2024 SAB $ 1,431,291.00

239 2027 RYE 43735

construct sidewalk, widen roadway shoulders for bike lanes and

evaluate crosswalks on Washington Rd Design 2029 TAP S 1,220,568.09

240 2020 SALEM 12334

RECONSTRUCT DEPOT INTERSECTION NH28 (BROADWAY) AND NH 97

(MAIN STREET) ADD TURN LANES ON NH28 Closeout 2024 Federal-Aid-LPA $ ' 6,995,440.92

241 2024 SALEM 42884

Improve signal operation at 28 intersections to identify hardware and

software upgrades needed. Construction 2025 CMAa HSIP $ 1,724,254.96

242 2024 SALEM 41750

0.3 mites of Bike-Ped trail along abandoned M&L rail line from Cluff

Crossing to Rockingham Pk Blvd Closeout 2025 CMAQ $ 1,491,557.49

243 2025 SALEM 44309 Replace Bridge St Bridge over Spicket River (Brg #115/097) Design 2027 MOBRR, SAB $ 5,645,874.00

244 2026 SALEM 43790 NHlll / Ermer Road intersection Safety Improvements Design 2028 HSIP $ 4,181,553.18

245 2029 SALEM 42885

Construct Rail Trail parallel to NH 28 for approx 1 mile - Main St south

to Rockingham Park Blvd Enrolled 2031 CMAQ $ 1,056,784.00

246 2031 SALEM 45265

Const. 1,400 LF sidewalk along Cluff Road Connecting neighborhood to

Municipal, Commercial & Retail Enrolled 2033 TAP $ 895,000.00

247 2033 SALEM 44628

Install (2) electric vehicle DC fast charging stations at 135 South

Broadway, Salem Enrolled 2035 CMAQ $ 400,000.00

248 2034 SALEM 45266

Const. 3,700 LF sidewalk along Lawrence Rd. and Veteran's Mem.

Prkwy. Enrolled 2036 TAP S 1,100,000.00

249 2027 SANDOWN 41412 Bridge Replacement-Phillips Road over Exeter River-Br. #093/109 Enrolled 2029 SAB S 1,310,000.00

250 2022 SOMERSWORTH 41363

Const sidewalks on High St, Memorial Dr, Cemetery Rd, upgrade

crosswalk across High St, const Path Closeout 2024 TAP s 1,251,015.96

251 2022 SOMERSWORTH 41741 Signal optimization on High Street / NH 9 corridor at 6 intersections Closeout 2024 CMAQ, HSIP S 720,019.00

252 2033 SOMERSWORTH 44260

Complete St. improvs on Main St. from ~lndigo to John Parson Dr.

-'3700LF Enrolled 2035 Federal-Aid-LPA $ 4,150,000.00

Attachment Ivffective October 1, 2025

Governor Executive Council - Informational Item NHDOT 2025 Local Public Agency (LPA) Annual Report List of LPA Projects.AcLYear _ Proiect Name Proiect # Description Current Status

Substantial Completion

Date LPA Funding Program

Currrent Estimate Co5t($)

All Funding -i.

253 2033 SOMERSWORTH 42627

West High St (from Cemetery Rd to High St) & High St (to Memorial Dr)

Pedestrian Improvements Enrolled 2035 Federal-Aid-LPA s 1,261,975.39

254 2036

SOMERSWORTH NH -

BERWICK MAINE 44389

Rehabilitate Salmon Falls Rd bridge over Salmon Falls River Brg

#78/124 Eddy Bridge Maine DOT Lead Enrolled 2038 MOBRR, SAB $ 1,110,000.00

255 2036

SOMERSWORTH NH-

BERWICK MAINE 44392

Rehabilitate Buffumsvills Rd bridge over Salmon Falls River

Brg#130/099 "New Dam" Brg MaineDOT lead Enrolled 2038 MOBRR, SAB $ 1,110,000.00

256 2037 SOUTH HAMPTON 44308 Replace Hilldale Ave Bridge over PowWow River (Brg#069/066) Enrolled 2039 MOBRR, SAB s 2,526,000.00

257 2025 SUGAR HILL 24218 Replace Crane Hill Road bridge over Gale River-Bridge# 202/128. Construction 2026 MOBIL, MOBRR, SAB s 4,514,417.09

258 2026 SWANZEY 41403 Bridge Replacement-Christian Hill Road over NHRR-Br. #098/122 Design 2028 MOBIL, SAB s 1,941,661.00

259 2027 SWANZEY 42511 Construct multi-use path on abandoned rail corridor Ashuelot Trail. Design 2029 TAP $ 1,822,712.00

260 2025 TILTON 29753 Engineering Study for Calef Hill Rd potential reclassification Closeout 2025 SAH $ 250,000.00

261 2034 WAKEFIELD 44302 Replace Maple Street Bridge over Branch River (Brdg #290/064) Enrolled 2036 MOBRR, SAB $ 1,948,900.00

262 2031 WALPOLE 44331

Replace Wentworth Road Bridge over Houghton Brook

(Br#213/076) Enrolled 2033 SAB $ 1,695,000.00

263 2031 WARNER 44356

Const.l.lmi Multi-use path in the 1-89 ROW to link Warner to

Davisville & Contoocook. Enrolled 2033 CMAQ s 2,951,534.00

264 2034 WARNER 44320 Replace North Village Rd Bridge over Stiver Brook (BR#189/099) Enrolled 2036 SAB $ 1,778,000.00

265 2026 WARNER 44161

Rail Trail-189 bridge underpass & trail improv. w/ 2 ped/bike bridges.

DemolD:NH096 Design 2028 EAR-NH $. 2,295,802.00

266 2030 WARREN 44325 Replace Fish Hatchery Road Bridge over Patch Brook (Br#120/058) Enrolled 2032 MOBRR, SAB s 1,688,000.00

267 2027 DORCHESTER 42092

Bridge Replacement-Province Road over South Branch of Baker River-

Br, #156/053 (#F157/053) Design 2029

Bridg-LPA-Rehab-Rcn, MOBIL,

MOBRR s 2,625,414.15

268 2032 KEENE-SWANZEY 40666

Reconstruct Winchester St: NH 101 to Market Basket (Swanzey) and

replace Ash Swamp Brook Bridge. Design 2034

Bridg-LPA-Rehab-Rcn, Federal-Aid-

LPA, MOBRR s 18,510,600.00

269 2025 WENTWORTH 40648 Bridge Replacement-Frescoln Road over Rocky Branch-Br. #108/070 Construction 2026 SAB s 1,373,813.94

270 2027 WENTWORTH 44858 East Side Road Bridge #160/148 Reconstruction Design 2029 EAR-NH $ 1,618,640.00

Attachment Ivffective October 1, 2025

Governor lixecutive Council - Informational Item NIIDOT 2025 Local Public Agency (LPA) Annual Report List of LPA Projects

^ # Ad Year Project Name Project # Description Current Status

Substantial Completion

Date LPA Funding Program

Currrent Estimate Cost($)

All Funding

271 2033 WESTMORELAND 44338 Replace River Road South Bridge over Partridge Brook (Br#089/100) Enrolled 2035 MOBRR, SAB $ 4,286,000.00

272 2026 WHITEFIELD 44158

Roadway & utilities recon/rehab on US3(Union St.) in downtown

Whitefield. Demo ID; NH095 Design 2028 EAR-NH S 1,750,000.00

273 2026 WILTON 15767 Bridge Rehabilitation-King Brook Rd over King Brook-Br. #074/060 Design 2028 SAB $ 1,680,861.23

274 2027 WILTON 15768

Bridge Replacement-Old County Farm Rd over Blood Brook-Br.

#060/118 Design 2029 MOBIL, SAB $ 1,677,938.85

275 2029 WILTON 44304 Replace Temple Rd Bridge over Blood Brook (Br#063/105) Enrolled 2031 MOBRR, SAB $ 1,758,000,00

276 2029 WILTON 44295

Construct a pedestrian bridge over Souhegan River to connect

Riverside Way and Howard St. Enrolled 2031 CMAQ $ 1,100,000.00

277 2032 WILTON 43540 New pedestrian bridge across Stony Brook at Wilton riverwalk Enrolled 2034 Federal-Ald-LPA $ 808,440.49

278 2032 WINDHAM 44633

Install (2) electric vehicle DC fast charging stations at 13-15

Rockingham Road Rte 28 in Windham Enrolled 2034 CMAQ $ 400,000.00

Attachment I-'ffective October 1, 2025

Case records

Open case page

Docket: 2026-0003

Date Record Text Type Party PDF
April 24, 2026 K.P. v. O.v. Supreme Court case order Supreme Court PDF
March 4, 2026 Governor and Executive Council Agenda item PDF - 2026-03-04 - agenda 3 Current page Other PDF