Governor and Executive Council Agenda item PDF - 2026-05-20 - agenda 027

John O. Morton Building · 7 Hazen Drive · P.O. Box 483 · Concord, New Hampshire 03302-0483

Telephone: (603) 271-3734 · Fax: (603) 271-3914 · TDD: Relay NH 1-800-735-2964 · dot.nh.gov

The State of New Hampshire

Department of Transportation

David Rodrigue, P.E.

Commissioner

Michelle L. Winters

Deputy Commissioner

Her Excellency, Governor Kelly A. Ayotte Bureau of Construction

and the Honorable Council April 30, 2026

State House

Concord, New Hampshire 03301

Requested Action

1. Authorize the Department of Transportation to enter into a contract with Neil H. Daniels, Inc. (Vendor 262804) of

Ascutney, VT on the basis of a low bid of $2,988,632 for reconstruction of NH 123A adjacent to the Cold River and Vilas

Pool Dam to repair damage resulting from a 2021 storm events, (Project: Alstead #43566A/43566B), from the date of

Governor and Council approval through November 20, 2026, unless amended by the Department in accordance with the

Standard Specifications. 100% Other Funds.

Funds are available in the following account for Fiscal Years 2026 and 2027, with the authority to adjust encumbrances

between fiscal years within the price limitation through the Budget Office, if needed and justified:

Funding is available as follows: FY 2026 FY 2027

04-96-96-960515-3031

Reimbursable Maint. and Repairs

400-500870 Highway Contract Payments $2,422,219.00 $267,549.80

04-96-96-963015-3039

Betterment

400-500870 Highway Contract Payments $268,976.88 $29,886.32

2. Further authorize that a contingency in the amount of $298,863.20 be approved for payment of latent conditions,

which may appear during the construction of the project. The contingency requested is 10% of the contract amount.

Funding is available as follows: FY 2027

04-96-96-963015-3039

Betterment

400-500870 Highway Contract Payments $298,863.20

Explanation

The projects were initiated as a permanent repair response due to damage to the roadway which occurred during the

July 29-30, 2021 storm event. The projects propose a new retaining wall and 1,000 feet of roadway reconstruction along

a segment of NH 123A beginning approximately 0.1 miles north of the intersection of NH 123 and NH 123A in the Town

of Alstead. The projects reconstruct NH 123A adjacent to the Cold River and Vilas Pool Dam to repair damage resulting

from 2021 storm events, which overtopped the Vilas Pool Dam and severely eroded NH 123A.

While advertised as a single construction contract, there are two projects for Federal Emergency Management Agency

(FEMA) administration purposes. The 43566A project extends from the southerly project limits to the Vilas Pool Dam

parking area, and the 43566B project covers from there to the northerly project limits.

This section of NH 123A adjacent to the Vilas Pool Dam has a history of flood damage resulting from insufficient dam

spillway capacity during extreme storm events. The alternate spillway is NH 123A with the Cold River overwhelming

ditch lines and eroding pavement and embankments. The Department successfully applied for FEMA Project Assistance

Program mitigation funding by demonstrating a retaining wall will incorporate resilience to withstand high-flow

conditions and reduce the risk of future damage. The retaining wall stabilizes the embankment that supports NH-123A

along the Cold River east bank, thereby protecting the roadway from erosion, undermining and potential failure during

future flood events. Additional drainage, grading and rock removal adjacent to the dam, and permanent erosion control

improvements are proposed to divert away from NH 123A during flooding events. In addition to other ancillary

improvements, the roadway shoulder width and cross slope in the area of the new retaining wall has been designed to

accommodate pedestrian and bicycle traffic.

The proposed contingency amount is 10% of the contract amount. This is to account for the risks associated with the

large quantity of rock excavation and construction restrictions from project agreements such as limited roadway closure

window and maintaining access to the Vilas Pool Dam.

Although the bid costs exceeded the Department’s estimate by 20.72%, the low bid of two bids received is felt to be

reasonable for the work involved. The confines of the work site and the rural location of the project likely contributed to

the higher than expected bid prices. Major items that contributed to the increase cost include Item 203.2 - Rock

Excavation $87,000, Item 520.12 - Concrete Class A, Above Footings (F) $105,000, Item 504.101 - Common Bridge

Excavation $40,000, Item 504.2 - Rock Bridge Excavation $40,000, and Item 692. Mobilization $115,000. Readvertising

this project would result, in our opinion, in higher prices and prevent the completion of the work in a timely manner. The

Department considers it to be in the best interest of the State to accept this bid to accomplish these needed repairs.

The Contractor has been prequalified by this Department. The Contract has been approved by the Attorney General as

to form and execution, and the Department has certified that the necessary funds are available and the bid reasonably

conforms to the engineer’s estimate in accordance with State procedure. Copies of the fully executed contract are on file

at the Secretary of State’s Office and the Department of Administrative Service’s Office and subsequent to Governor and

Council approval will be on file at the Department of Transportation.

This project funding is: 90% Federal funds (FEMA Public Assistance Funds) w/ 10% Non-participating State (Betterment)

match.

A copy of the Tabulation of Bids received for this project is attached along with the Contract Supplemental Sheet and a

map indicating the location of the project.

Your approval of this resolution is respectfully requested. The Department of Transportation has determined that the

vendor is in good standing with the Secretary of State’s Office, has secured the required levels of insurance, and has

provided evidence of authority to execute and be bound by the contract.

Sincerely,

David M. Rodrigue, P.E.

Commissioner

DMR/pcj

Department Estimate: $2,475,699.50

Contract Amount: $2,988,632.00

Over Estimate: $ 512,932.50

Attachments

ABC Bid Data

ALSTEAD

43566A, 43566B

NON-FEDERAL, NON-FEDERAL

PROJECT:

STATE PROJECT NUMBER:

FED. PROJECT NUMBER:

DATE BIDS OPEN:

SCOPE OF WORK:

COMPLETION DATE:

LOCATION:

ALSTEAD Awarded To:

43566A, 43566B

NON-FEDERAL, NON-FEDERAL

March 19, 2026, 2:00

NH 123A Roadway and slope stabilization repair at approximately MM 2.0 (B58 project Amount:

storm STM77350)

November 20, 2026 Award Date:

Cheshire, District 4

DANIELS, NEIL H. INC.

4409 ROUTE 5 SOUTH

ASCUTNEY, VT 05030-0246

$2,988,632.00 Certified by: TOBEY.L.REYNOLDS

Director of Project Development

Summary of Bidders

Contractor Bid Amount Rank

DANIELS, NEIL H. INC.

4409 ROUTE 5 SOUTH, PO BOX 246, ASCUTNEY VT 05030-0246

$2,988,632.00 A

COLD RIVER BRIDGES LLC $3,267,494.50 B

10 LANBRO LANE UNIT 2, WALPOLE NH 03608

Tuesday, April 7, 2026

ABC Bid Data

ALSTEAD

43566A, 43566B

NON-FEDERAL, NON-FEDERAL

PS&E DANIELS, NEIL H. INC.

4409 ROUTE 5 SOUTH

ASCUTNEY, VT 05030-0246

COLD RIVER BRIDGES LLC

10 LANBRO LANE UNIT 2

WALPOLE, NH 03608

Item No. Description Unit Quantity Unit Price Total Unit Price Total Unit Price Total

Items

201.881 INVASIVE SPECIES CONTROL TYPE I SY 23.00 $10.00 $230.00 $28.50 $655.50 $25.00 $575.00

202.41 REMOVAL OF EXISTING PIPE 0-24" DIAMETER LF 50.00 $25.00 $1,250.00 $17.25 $862.50 $15.00 $750.00

202.7 REMOVAL OF GUARDRAIL LF 250.00 $4.00 $1,000.00 $5.00 $1,250.00 $10.00 $2,500.00

203.1 COMMON EXCAVATION CY 3,200.00 $20.00 $64,000.00 $20.75 $66,400.00 $18.00 $57,600.00

203.11 COMMON EXCAVATION - LRS CY 145.00 $30.00 $4,350.00 $28.50 $4,132.50 $25.00 $3,625.00

203.2 ROCK EXCAVATION CY 395.00 $45.00 $17,775.00 $265.00 $104,675.00 $230.00 $90,850.00

203.5571 EAGRT PLATFORM PREFERRED, TL 2 - 25' U 2.00 $1,500.00 $3,000.00 $1,725.00 $3,450.00 $1,500.00 $3,000.00

203.5572 EAGRT PLATFORM ALTERNATE, TL 2 - 25' U 2.00 $1,500.00 $3,000.00 $1,500.00 $3,000.00 $1,300.00 $2,600.00

203.6 EMBANKMENT-IN-PLACE (F) CY 19.00 $8.00 $152.00 $28.50 $541.50 $25.00 $475.00

206.1 COMMON STRUCTURE EXCAVATION CY 6.00 $50.00 $300.00 $70.00 $420.00 $60.00 $360.00

206.2 ROCK STRUCTURE EXCAVATION CY 185.00 $120.00 $22,200.00 $265.00 $49,025.00 $230.00 $42,550.00

209.201 GRANULAR BACKFILL (BRIDGE) (F) CY 530.00 $65.00 $34,450.00 $69.00 $36,570.00 $75.00 $39,750.00

211.12 DEFORMATION MONITORING SERVICES HR 340.00 $285.00 $96,900.00 $240.00 $81,600.00 $175.00 $59,500.00

214. FINE GRADING U 1.00 $9,300.00 $9,300.00 $11,500.00 $11,500.00 $10,000.00 $10,000.00

304.1 SAND (F) CY 993.00 $50.00 $49,650.00 $37.00 $36,741.00 $32.00 $31,776.00

304.2 GRAVEL (F) CY 1,027.00 $45.00 $46,215.00 $42.00 $43,134.00 $37.00 $37,999.00

304.3 CRUSHED GRAVEL (F) CY 1,039.00 $45.00 $46,755.00 $50.00 $51,950.00 $44.00 $45,716.00

304.32 CRUSHED GRAVEL FOR SHOULDER LEVELING TON 53.00 $42.00 $2,226.00 $75.00 $3,975.00 $65.00 $3,445.00

304.35 CRUSHED GRAVEL FOR DRIVES CY 135.00 $45.00 $6,075.00 $52.00 $7,020.00 $45.00 $6,075.00

403.11033 HBP-3/4" WINTER BINDER MIX, MACHINE METHOD TON 465.00 $110.00 $51,150.00 $138.00 $64,170.00 $132.00 $61,380.00

403.11053 HBP-3/8" SURFACE MIX, MACHINE METHOD TON 255.00 $110.00 $28,050.00 $173.00 $44,115.00 $165.00 $42,075.00

403.12 HBP-HAND METHOD TON 64.00 $210.00 $13,440.00 $288.00 $18,432.00 $275.00 $17,600.00

403.16 PAVEMENT JOINT ADHESIVE LF 2,380.00 $0.50 $1,190.00 $1.35 $3,213.00 $2.00 $4,760.00

403.19 HBP-TEMPORARY TON 170.00 $130.00 $22,100.00 $173.00 $29,410.00 $165.00 $28,050.00

Tuesday, April 7, 2026

ABC Bid Data

ALSTEAD

43566A, 43566B

NON-FEDERAL, NON-FEDERAL

Item No. Description Unit Quantity

PS&E DANIELS, NEIL H. INC.

4409 ROUTE 5 SOUTH

ASCUTNEY, VT 05030-0246

COLD RIVER BRIDGES LLC

10 LANBRO LANE UNIT 2

WALPOLE, NH 03608

Unit Price Total Unit Price Total Unit Price Total

410.22 ASPHALT EMULSION FOR TACK COAT GAL 95.00 $5.50 $522.50 $17.50 $1,662.50 $15.00 $1,425.00

413.1 HOT-POURED CRACK SEALANT (ROUTED) LB 95.00 $4.00 $380.00 $40.00 $3,800.00 $100.00 $9,500.00

417. COLD PLANING BITUMINOUS SURFACES SY 240.00 $4.00 $960.00 $46.00 $11,040.00 $44.00 $10,560.00

503.101 WATER DIVERSION STRUCTURE U 1.00 $3,000.00 $3,000.00 $5,000.00 $5,000.00 $7,000.00 $7,000.00

503.201 COFFERDAMS U 1.00 $80,000.00 $80,000.00 $50,000.00 $50,000.00 $150,000.00 $150,000.00

504.101 COMMON BRIDGE EXCAVATION CY 1,190.00 $110.00 $130,900.00 $35.75 $42,542.50 $31.00 $36,890.00

504.2 ROCK BRIDGE EXCAVATION CY 520.00 $200.00 $104,000.00 $277.00 $144,040.00 $240.00 $124,800.00

520.01 CONCRETE CLASS AA CY 13.00 $2,000.00 $26,000.00 $3,500.00 $45,500.00 $3,000.00 $39,000.00

520.12 CONCRETE CLASS A, ABOVE FOOTINGS (F) CY 150.00 $1,250.00 $187,500.00 $1,950.00 $292,500.00 $2,500.00 $375,000.00

520.21 CONCRETE CLASS B, FOOTINGS (F) CY 122.00 $500.00 $61,000.00 $500.00 $61,000.00 $1,500.00 $183,000.00

520.211 CONCRETE CLASS B, FOOTINGS (ON ROCK) CY 450.00 $500.00 $225,000.00 $500.00 $225,000.00 $800.00 $360,000.00

534.3 WATER REPELLENT (SILANE/SILOXANE) GAL 17.00 $135.00 $2,295.00 $150.00 $2,550.00 $150.00 $2,550.00

538.2 BARRIER MEMBRANE, PEEL AND STICK - VERTICAL

SURFACES (F)

SY 65.00 $100.00 $6,500.00 $85.00 $5,525.00 $50.00 $3,250.00

541.2 PVC WATERSTOPS, NH TYPE 2 (F) LF 43.00 $15.00 $645.00 $25.00 $1,075.00 $25.00 $1,075.00

541.3 PVC WATERSTOPS, NH TYPE 3 (F) LF 21.00 $15.00 $315.00 $25.00 $525.00 $25.00 $525.00

541.4 PVC WATERSTOPS, NH TYPE 4 (F) LF 10.00 $15.00 $150.00 $25.00 $250.00 $25.00 $250.00

544.2 REINFORCING STEEL, EPOXY COATED (F) LB 38,167.00 $3.00 $114,501.00 $3.00 $114,501.00 $3.00 $114,501.00

545.2 DRILLED AND GROUTED STEEL DOWELS EA 30.00 $2,000.00 $60,000.00 $1,750.00 $52,500.00 $1,000.00 $30,000.00

562.1 SILICONE JOINT SEALANT (F) LF 48.00 $32.00 $1,536.00 $35.00 $1,680.00 $50.00 $2,400.00

563.24 BRIDGE RAIL T4 LF 195.00 $450.00 $87,750.00 $600.00 $117,000.00 $460.00 $89,700.00

565.242 BRIDGE APPROACH RAIL T4 (STEEL POSTS) U 2.00 $16,000.00 $32,000.00 $21,500.00 $43,000.00 $14,000.00 $28,000.00

582.101 CONCRETE SLOPE PAVING SY 90.00 $175.00 $15,750.00 $185.00 $16,650.00 $250.00 $22,500.00

583.7 RIPRAP, CLASS VII CY 590.00 $100.00 $59,000.00 $86.50 $51,035.00 $65.00 $38,350.00

585.3 STONE FILL, CLASS C CY 122.00 $65.00 $7,930.00 $92.00 $11,224.00 $75.00 $9,150.00

593.411 GEOTEXTILE; PERM CONTROL CL.1, NON-WOVEN SY 1,090.00 $4.50 $4,905.00 $4.00 $4,360.00 $5.00 $5,450.00

603.0001 VIDEO INSPECTION LF 258.00 $2.00 $516.00 $10.00 $2,580.00 $20.00 $5,160.00

Tuesday, April 7, 2026

ABC Bid Data

ALSTEAD

43566A, 43566B

NON-FEDERAL, NON-FEDERAL

Item No. Description Unit Quantity

PS&E DANIELS, NEIL H. INC.

4409 ROUTE 5 SOUTH

ASCUTNEY, VT 05030-0246

COLD RIVER BRIDGES LLC

10 LANBRO LANE UNIT 2

WALPOLE, NH 03608

Unit Price Total Unit Price Total Unit Price Total

603.00236 36" R.C. PIPE, 2000D LF 208.00 $220.00 $45,760.00 $260.00 $54,080.00 $225.00 $46,800.00

603.34115 15" STEEL END SECTIONS EA 1.00 $450.00 $450.00 $460.00 $460.00 $400.00 $400.00

603.82215 15" PE PIPE (TYPE S) LF 50.00 $90.00 $4,500.00 $115.00 $5,750.00 $100.00 $5,000.00

604.1951 SPECIAL CATCH BASIN TYPE G, 5 FT DIAMETER U 4.60 $6,100.00 $28,060.00 $10,500.00 $48,300.00 $9,000.00 $41,400.00

604.242 DROP INLETS TYPE D-B U 1.00 $4,500.00 $4,500.00 $4,500.00 $4,500.00 $3,900.00 $3,900.00

606.12551 BEAM GUARDRAIL (TERMINAL UNIT TYPE EAGRT, TL 2 -

25') (STEEL POST)

U 4.00 $3,900.00 $15,600.00 $4,500.00 $18,000.00 $3,800.00 $15,200.00

606.18001 31" W-BEAM GUARDRAIL WITH 8" OFFSET BLOCK

(STEEL POST)

LF 312.50 $34.00 $10,625.00 $38.00 $11,875.00 $31.00 $9,687.50

606.417 PORTABLE CONCRETE BARRIER FOR TRAFFIC CONTROL LF 700.00 $40.00 $28,000.00 $40.00 $28,000.00 $50.00 $35,000.00

606.9522 TEMP. IMPACT ATTENUATION DEVICE

(NON-REDIRECTIVE) TEST LEVEL 2

U 1.00 $4,700.00 $4,700.00 $5,000.00 $5,000.00 $6,000.00 $6,000.00

607.5340 WOOD FENCE (SPLIT RAIL) 4'-0" HIGH LF 32.00 $35.00 $1,120.00 $69.00 $2,208.00 $50.00 $1,600.00

615.033 REMOVING TRAFFIC SIGN, TYPE C U 4.00 $80.00 $320.00 $100.00 $400.00 $50.00 $200.00

615.034 RELOCATING TRAFFIC SIGN, TYPE C U 1.00 $250.00 $250.00 $250.00 $250.00 $100.00 $100.00

618.7 FLAGGERS HR 1,420.00 $45.00 $63,900.00 $55.00 $78,100.00 $65.00 $92,300.00

619.1 MAINTENANCE OF TRAFFIC U 1.00 $110,000.00 $110,000.00 $125,000.00 $125,000.00 $125,000.00 $125,000.00

619.25 PORTABLE CHANGEABLE MESSAGE SIGN U 6.00 $3,900.00 $23,400.00 $9,500.00 $57,000.00 $7,500.00 $45,000.00

621.2 RETROREFLECTIVE BEAM GUARDRAIL DELINEATOR EA 11.00 $10.00 $110.00 $12.00 $132.00 $25.00 $275.00

621.31 SINGLE DELINEATOR WITH POST EA 20.00 $65.00 $1,300.00 $75.00 $1,500.00 $100.00 $2,000.00

621.32 DOUBLE DELINEATOR WITH POST EA 2.00 $70.00 $140.00 $85.00 $170.00 $120.00 $240.00

622.1 STEEL WITNESS MARKERS EA 6.00 $75.00 $450.00 $55.00 $330.00 $80.00 $480.00

628.2 SAWED BITUMINOUS PAVEMENT LF 50.00 $5.00 $250.00 $10.00 $500.00 $10.00 $500.00

632.0104 RETROREFLECTIVE PAINT PAVE. MARKING, 4" LINE LF 11,500.00 $0.25 $2,875.00 $0.35 $4,025.00 $0.30 $3,450.00

632.1118 PREFORMED RETROREFLECTIVE TAPE, TYPE I

(REMOVABLE) 18" LINE

LF 22.00 $8.00 $176.00 $50.00 $1,100.00 $25.00 $550.00

645.3 EROSION STONE TON 60.00 $40.00 $2,400.00 $55.00 $3,300.00 $65.00 $3,900.00

645.44 TEMPORARY SLOPE MATTING TYPE D (WILDLIFE

FRIENDLY)

SY 385.00 $3.00 $1,155.00 $5.00 $1,925.00 $8.00 $3,080.00

645.512 COMPOST SOCK FOR PERIMETER BERM LF 1,110.00 $6.00 $6,660.00 $8.00 $8,880.00 $8.00 $8,880.00

645.531 SILT FENCE LF

1,110.00 $4.00 $4,440.00 $4.00 $4,440.00 $3.00 $3,330.00

Tuesday, April 7, 2026

ABC Bid Data

ALSTEAD

43566A, 43566B

NON-FEDERAL, NON-FEDERAL

Item No. Description Unit Quantity

PS&E DANIELS, NEIL H. INC.

4409 ROUTE 5 SOUTH

ASCUTNEY, VT 05030-0246

COLD RIVER BRIDGES LLC

10 LANBRO LANE UNIT 2

WALPOLE, NH 03608

Unit Price Total Unit Price Total Unit Price Total

645.7 STORM WATER POLLUTION PREVENTION PLAN U 1.00 $10,000.00 $10,000.00 $7,500.00 $7,500.00 $10,000.00 $10,000.00

645.71 WATER QUALITY MONITORING, INSPECTION AND

REPORTING

HR 135.00 $120.00 $16,200.00 $215.00 $29,025.00 $175.00 $23,625.00

645.72 FINAL WETLAND IMPACT REPORT U 1.00 $4,000.00 $4,000.00 $3,500.00 $3,500.00 $3,000.00 $3,000.00

645.73 STREAM DIVERSION PLAN U 1.00 $4,000.00 $4,000.00 $3,500.00 $3,500.00 $3,000.00 $3,000.00

646.41 TURF ESTABLISHMENT WITH MULCH, TACKIFIERS AND

HUMUS

SY 130.00 $9.00 $1,170.00 $20.00 $2,600.00 $10.00 $1,300.00

670.0491 CONSTRUCT AND REMOVE TEMPORARY ACCESS

ROAD

U 1.00 $20,000.00 $20,000.00 $50,000.00 $50,000.00 $75,000.00 $75,000.00

670.104 TEMPORARY PORTABLE LIGHTING U 2.00 $10,000.00 $20,000.00 $5,000.00 $10,000.00 $5,000.00 $10,000.00

670.822 GNSS CONSTRUCTION INSPECTION EQUIPMENT U 1.00 $20,000.00 $20,000.00 $35,000.00 $35,000.00 $30,000.00 $30,000.00

670.95 TEMPORARY SAFETY FENCE LF 450.00 $7.50 $3,375.00 $20.00 $9,000.00 $5.00 $2,250.00

692. MOBILIZATION U 1.00 $180,000.00 $180,000.00 $295,000.00 $295,000.00 $300,000.00 $300,000.00

697.31 PROJECT OPERATIONS PLAN U 1.00 $5,000.00 $5,000.00 $3,500.00 $3,500.00 $10,000.00 $10,000.00

698.13 FIELD OFFICE TYPE C MON 10.00 $2,100.00 $21,000.00 $3,000.00 $30,000.00 $3,000.00 $30,000.00

699. MISCELLANEOUS TEMPORARY EROSION AND

SEDIMENT CONTROL

$ 20,000.00 $1.00 $20,000.00 $1.00 $20,000.00 $1.00 $20,000.00

1008.11 ALTERATIONS AND ADDITIONS AS NEEDED -

UNANTICIPATED WORK

$ 10,000.00 $1.00 $10,000.00 $1.00 $10,000.00 $1.00 $10,000.00

1008.251 ALTERATIONS AND ADDITIONS AS NEEDED -

TEMPORARY PEDESTRIAN ACCOMMODATIONS

$ 2,000.00 $1.00 $2,000.00 $1.00 $2,000.00 $1.00 $2,000.00

1008.522 ALTERATIONS AND ADDITIONS AS NEEDED - HOLDING

TANK (FRAC TANK) FOR SEDIMENT CONTROL

$ 20,000.00 $1.00 $20,000.00 $1.00 $20,000.00 $1.00 $20,000.00

1010.15 FUEL ADJUSTMENT $ 20,000.00 $1.00 $20,000.00 $1.00 $20,000.00 $1.00 $20,000.00

Totals:

Alt. Totals:

Totals:

$2,475,699.50 $2,988,632.00 $3,267,494.50

$2,475,699.50 $2,988,632.00 $3,267,494.50

Tuesday, April 7, 2026

PS&E Comparison

ALSTEAD

43566A, 43566B

NON-FEDERAL, NON-FEDERAL

A-Bidder PS&E

Item No. Description Unit Quantity Unit Price Total Unit Price Total A-PS&E Difference

Items

201.881 INVASIVE SPECIES CONTROL TYPE I SY 23.00 $28.50 $655.50 $10.00 $230.00 $425.50

202.41 REMOVAL OF EXISTING PIPE 0-24" DIAMETER LF 50.00 $17.25 $862.50 $25.00 $1,250.00 ($387.50)

202.7 REMOVAL OF GUARDRAIL LF 250.00 $5.00 $1,250.00 $4.00 $1,000.00 $250.00

203.1 COMMON EXCAVATION CY 3,200.00 $20.75 $66,400.00 $20.00 $64,000.00 $2,400.00

203.11 COMMON EXCAVATION - LRS CY 145.00 $28.50 $4,132.50 $30.00 $4,350.00 ($217.50)

203.2 ROCK EXCAVATION CY 395.00 $265.00 $104,675.00 $45.00 $17,775.00 $86,900.00

203.5571 EAGRT PLATFORM PREFERRED, TL 2 - 25' U 2.00 $1,725.00 $3,450.00 $1,500.00 $3,000.00 $450.00

203.5572 EAGRT PLATFORM ALTERNATE, TL 2 - 25' U 2.00 $1,500.00 $3,000.00 $1,500.00 $3,000.00 $0.00

203.6 EMBANKMENT-IN-PLACE (F) CY 19.00 $28.50 $541.50 $8.00 $152.00 $389.50

206.1 COMMON STRUCTURE EXCAVATION CY 6.00 $70.00 $420.00 $50.00 $300.00 $120.00

206.2 ROCK STRUCTURE EXCAVATION CY 185.00 $265.00 $49,025.00 $120.00 $22,200.00 $26,825.00

209.201 GRANULAR BACKFILL (BRIDGE) (F) CY 530.00 $69.00 $36,570.00 $65.00 $34,450.00 $2,120.00

211.12 DEFORMATION MONITORING SERVICES HR 340.00 $240.00 $81,600.00 $285.00 $96,900.00 ($15,300.00)

214. FINE GRADING U 1.00 $11,500.00 $11,500.00 $9,300.00 $9,300.00 $2,200.00

304.1 SAND (F) CY 993.00 $37.00 $36,741.00 $50.00 $49,650.00 ($12,909.00)

Tuesday, April 7, 2026

PS&E Comparison

ALSTEAD

43566A, 43566B

NON-FEDERAL, NON-FEDERAL

A-Bidder PS&E

Item No. Description Unit Quantity Unit Price Total Unit Price Total A-PS&E Difference

304.2 GRAVEL (F) CY 1,027.00 $42.00 $43,134.00 $45.00 $46,215.00 ($3,081.00)

304.3 CRUSHED GRAVEL (F) CY 1,039.00 $50.00 $51,950.00 $45.00 $46,755.00 $5,195.00

304.32 CRUSHED GRAVEL FOR SHOULDER

LEVELING TON 53.00 $75.00 $3,975.00 $42.00 $2,226.00 $1,749.00

304.35 CRUSHED GRAVEL FOR DRIVES CY 135.00 $52.00 $7,020.00 $45.00 $6,075.00 $945.00

403.11033 HBP-3/4" WINTER BINDER MIX, MACHINE

METHOD

TON 465.00 $138.00 $64,170.00 $110.00 $51,150.00 $13,020.00

403.11053 HBP-3/8" SURFACE MIX, MACHINE METHOD TON 255.00 $173.00 $44,115.00 $110.00 $28,050.00 $16,065.00

403.12 HBP-HAND METHOD TON 64.00 $288.00 $18,432.00 $210.00 $13,440.00 $4,992.00

403.16 PAVEMENT JOINT ADHESIVE LF 2,380.00 $1.35 $3,213.00 $0.50 $1,190.00 $2,023.00

403.19 HBP-TEMPORARY TON 170.00 $173.00 $29,410.00 $130.00 $22,100.00 $7,310.00

410.22 ASPHALT EMULSION FOR TACK COAT GAL 95.00 $17.50 $1,662.50 $5.50 $522.50 $1,140.00

413.1 HOT-POURED CRACK SEALANT (ROUTED) LB 95.00 $40.00 $3,800.00 $4.00 $380.00 $3,420.00

417. COLD PLANING BITUMINOUS SURFACES SY 240.00 $46.00 $11,040.00 $4.00 $960.00 $10,080.00

503.101 WATER DIVERSION STRUCTURE U 1.00 $5,000.00 $5,000.00 $3,000.00 $3,000.00 $2,000.00

503.201 COFFERDAMS U 1.00 $50,000.00 $50,000.00 $80,000.00 $80,000.00 ($30,000.00)

504.101 COMMON BRIDGE EXCAVATION CY 1,190.00 $35.75 $42,542.50 $110.00 $130,900.00 ($88,357.50)

504.2 ROCK BRIDGE EXCAVATION CY 520.00 $277.00 $144,040.00 $200.00 $104,000.00 $40,040.00

520.01 CONCRETE CLASS AA CY 13.00 $3,500.00 $45,500.00 $2,000.00 $26,000.00 $19,500.00

Tuesday, April 7, 2026

PS&E Comparison

ALSTEAD

43566A, 43566B

NON-FEDERAL, NON-FEDERAL

A-Bidder PS&E

Item No. Description Unit Quantity Unit Price Total Unit Price Total A-PS&E Difference

520.12 CONCRETE CLASS A, ABOVE FOOTINGS (F) CY 150.00 $1,950.00 $292,500.00 $1,250.00 $187,500.00 $105,000.00

520.21 CONCRETE CLASS B, FOOTINGS (F) CY 122.00 $500.00 $61,000.00 $500.00 $61,000.00 $0.00

520.211 CONCRETE CLASS B, FOOTINGS (ON ROCK) CY 450.00 $500.00 $225,000.00 $500.00 $225,000.00 $0.00

534.3 WATER REPELLENT (SILANE/SILOXANE) GAL 17.00 $150.00 $2,550.00 $135.00 $2,295.00 $255.00

538.2 BARRIER MEMBRANE, PEEL AND STICK -

VERTICAL

SURFACES (F)

SY 65.00 $85.00 $5,525.00 $100.00 $6,500.00 ($975.00)

541.2 PVC WATERSTOPS, NH TYPE 2 (F) LF 43.00 $25.00 $1,075.00 $15.00 $645.00 $430.00

541.3 PVC WATERSTOPS, NH TYPE 3 (F) LF 21.00 $25.00 $525.00 $15.00 $315.00 $210.00

541.4 PVC WATERSTOPS, NH TYPE 4 (F) LF 10.00 $25.00 $250.00 $15.00 $150.00 $100.00

544.2 REINFORCING STEEL, EPOXY COATED (F) LB 38,167.00 $3.00 $114,501.00 $3.00 $114,501.00 $0.00

545.2 DRILLED AND GROUTED STEEL DOWELS EA 30.00 $1,750.00 $52,500.00 $2,000.00 $60,000.00 ($7,500.00)

562.1 SILICONE JOINT SEALANT (F) LF 48.00 $35.00 $1,680.00 $32.00 $1,536.00 $144.00

563.24 BRIDGE RAIL T4 LF 195.00 $600.00 $117,000.00 $450.00 $87,750.00 $29,250.00

565.242 BRIDGE APPROACH RAIL T4 (STEEL POSTS) U 2.00 $21,500.00 $43,000.00 $16,000.00 $32,000.00 $11,000.00

582.101 CONCRETE SLOPE PAVING SY 90.00 $185.00 $16,650.00 $175.00 $15,750.00 $900.00

583.7 RIPRAP, CLASS VII CY 590.00 $86.50 $51,035.00 $100.00 $59,000.00 ($7,965.00)

585.3 STONE FILL, CLASS C CY 122.00 $92.00 $11,224.00 $65.00 $7,930.00 $3,294.00

593.411 GEOTEXTILE; PERM CONTROL CL.1, NON-

WOVEN

SY 1,090.00 $4.00 $4,360.00 $4.50 $4,905.00 ($545.00)

Tuesday, April 7, 2026

PS&E Comparison

ALSTEAD

43566A, 43566B

NON-FEDERAL, NON-FEDERAL

A-Bidder PS&E

Item No. Description Unit Quantity Unit Price Total Unit Price Total A-PS&E Difference

603.0001 VIDEO INSPECTION LF 258.00 $10.00 $2,580.00 $2.00 $516.00 $2,064.00

603.00236 36" R.C. PIPE, 2000D LF 208.00 $260.00 $54,080.00 $220.00 $45,760.00 $8,320.00

603.34115 15" STEEL END SECTIONS EA 1.00 $460.00 $460.00 $450.00 $450.00 $10.00

603.82215 15" PE PIPE (TYPE S) LF 50.00 $115.00 $5,750.00 $90.00 $4,500.00 $1,250.00

604.1951 SPECIAL CATCH BASIN TYPE G, 5 FT

DIAMETER U 4.60 $10,500.00 $48,300.00 $6,100.00 $28,060.00 $20,240.00

604.242 DROP INLETS TYPE D-B U 1.00 $4,500.00 $4,500.00 $4,500.00 $4,500.00 $0.00

606.12551 BEAM GUARDRAIL (TERMINAL UNIT TYPE

EAGRT, TL 2 -

25') (STEEL POST)

U 4.00 $4,500.00 $18,000.00 $3,900.00 $15,600.00 $2,400.00

606.18001 31" W-BEAM GUARDRAIL WITH 8" OFFSET

BLOCK

(STEEL POST)

LF 312.50 $38.00 $11,875.00 $34.00 $10,625.00 $1,250.00

606.417 PORTABLE CONCRETE BARRIER FOR

TRAFFIC CONTROL LF 700.00 $40.00 $28,000.00 $40.00 $28,000.00 $0.00

606.9522 TEMP. IMPACT ATTENUATION DEVICE

(NON-REDIRECTIVE) TEST LEVEL 2

U 1.00 $5,000.00 $5,000.00 $4,700.00 $4,700.00 $300.00

607.5340 WOOD FENCE (SPLIT RAIL) 4'-0" HIGH LF 32.00 $69.00 $2,208.00 $35.00 $1,120.00 $1,088.00

615.033 REMOVING TRAFFIC SIGN, TYPE C U 4.00 $100.00 $400.00 $80.00 $320.00 $80.00

615.034 RELOCATING TRAFFIC SIGN, TYPE C U 1.00 $250.00 $250.00 $250.00 $250.00 $0.00

618.7 FLAGGERS HR 1,420.00 $55.00 $78,100.00 $45.00 $63,900.00 $14,200.00

619.1 MAINTENANCE OF TRAFFIC U 1.00 $125,000.00 $125,000.00 $110,000.00 $110,000.00 $15,000.00

619.25 PORTABLE CHANGEABLE MESSAGE SIGN U 6.00 $9,500.00 $57,000.00 $3,900.00 $23,400.00 $33,600.00

Tuesday, April 7, 2026

PS&E Comparison

ALSTEAD

43566A, 43566B

NON-FEDERAL, NON-FEDERAL

A-Bidder PS&E

Item No. Description Unit Quantity Unit Price Total Unit Price Total A-PS&E Difference

621.2 RETROREFLECTIVE BEAM GUARDRAIL

DELINEATOR EA 11.00 $12.00 $132.00 $10.00 $110.00 $22.00

621.31 SINGLE DELINEATOR WITH POST EA 20.00 $75.00 $1,500.00 $65.00 $1,300.00 $200.00

621.32 DOUBLE DELINEATOR WITH POST EA 2.00 $85.00 $170.00 $70.00 $140.00 $30.00

622.1 STEEL WITNESS MARKERS EA 6.00 $55.00 $330.00 $75.00 $450.00 ($120.00)

628.2 SAWED BITUMINOUS PAVEMENT LF 50.00 $10.00 $500.00 $5.00 $250.00 $250.00

632.0104 RETROREFLECTIVE PAINT PAVE. MARKING, 4"

LINE LF 11,500.00 $0.35 $4,025.00 $0.25 $2,875.00 $1,150.00

632.1118 PREFORMED RETROREFLECTIVE TAPE, TYPE

I

(REMOVABLE) 18" LINE

LF 22.00 $50.00 $1,100.00 $8.00 $176.00 $924.00

645.3 EROSION STONE TON 60.00 $55.00 $3,300.00 $40.00 $2,400.00 $900.00

645.44 TEMPORARY SLOPE MATTING TYPE D

(WILDLIFE

FRIENDLY)

SY 385.00 $5.00 $1,925.00 $3.00 $1,155.00 $770.00

645.512 COMPOST SOCK FOR PERIMETER BERM LF 1,110.00 $8.00 $8,880.00 $6.00 $6,660.00 $2,220.00

645.531 SILT FENCE LF 1,110.00 $4.00 $4,440.00 $4.00 $4,440.00 $0.00

645.7 STORM WATER POLLUTION PREVENTION

PLAN U 1.00 $7,500.00 $7,500.00 $10,000.00 $10,000.00 ($2,500.00)

645.71 WATER QUALITY MONITORING, INSPECTION

AND

REPORTING

HR 135.00 $215.00 $29,025.00 $120.00 $16,200.00 $12,825.00

645.72 FINAL WETLAND IMPACT REPORT U 1.00 $3,500.00 $3,500.00 $4,000.00 $4,000.00 ($500.00)

645.73 STREAM DIVERSION PLAN U 1.00 $3,500.00 $3,500.00 $4,000.00 $4,000.00 ($500.00)

646.41 TURF ESTABLISHMENT WITH MULCH,

TACKIFIERS AND

HUMUS

SY 130.00 $20.00 $2,600.00 $9.00 $1,170.00 $1,430.00

Tuesday, April 7, 2026

PS&E Comparison

ALSTEAD

43566A, 43566B

NON-FEDERAL, NON-FEDERAL

A-Bidder PS&E

Item No. Description Unit Quantity Unit Price Total Unit Price Total A-PS&E Difference

670.0491 CONSTRUCT AND REMOVE TEMPORARY

ACCESS

ROAD

U 1.00 $50,000.00 $50,000.00 $20,000.00 $20,000.00 $30,000.00

670.104 TEMPORARY PORTABLE LIGHTING U 2.00 $5,000.00 $10,000.00 $10,000.00 $20,000.00 ($10,000.00)

670.822 GNSS CONSTRUCTION INSPECTION

EQUIPMENT

U 1.00 $35,000.00 $35,000.00 $20,000.00 $20,000.00 $15,000.00

670.95 TEMPORARY SAFETY FENCE LF 450.00 $20.00 $9,000.00 $7.50 $3,375.00 $5,625.00

692. MOBILIZATION U 1.00 $295,000.00 $295,000.00 $180,000.00 $180,000.00 $115,000.00

697.31 PROJECT OPERATIONS PLAN U 1.00 $3,500.00 $3,500.00 $5,000.00 $5,000.00 ($1,500.00)

698.13 FIELD OFFICE TYPE C MON 10.00 $3,000.00 $30,000.00 $2,100.00 $21,000.00 $9,000.00

699. MISCELLANEOUS TEMPORARY EROSION AND

SEDIMENT CONTROL

$ 20,000.00 $1.00 $20,000.00 $1.00 $20,000.00 $0.00

1008.11 ALTERATIONS AND ADDITIONS AS NEEDED -

UNANTICIPATED WORK

$ 10,000.00 $1.00 $10,000.00 $1.00 $10,000.00 $0.00

1008.251 ALTERATIONS AND ADDITIONS AS NEEDED -

TEMPORARY PEDESTRIAN

ACCOMMODATIONS

$ 2,000.00 $1.00 $2,000.00 $1.00 $2,000.00 $0.00

1008.522 ALTERATIONS AND ADDITIONS AS NEEDED -

HOLDING

TANK (FRAC TANK) FOR SEDIMENT CONTROL

$ 20,000.00 $1.00 $20,000.00 $1.00 $20,000.00 $0.00

1010.15 FUEL ADJUSTMENT $ 20,000.00 $1.00 $20,000.00 $1.00 $20,000.00 $0.00

Total: $2,988,632.00 $2,475,699.50 $512,932.50

Tuesday, April 7, 2026

ALSTEAD

FEMA 670942 & 670941

43566A & 43566B

February 25, 2026

S:\Global\B14-FinanceContracts\Contracts\SPIS-Map\43566A-43566B_SPIS.docx

SUPPLEMENTAL PROJECT INFORMATION SHEET

DESCRIPTION: The projects propose a new retaining wall and 1000 feet of roadway reconstruction along a

segment of NH 123A beginning approximately 0.1 miles north of the intersection of NH 123 and NH 123A in

the Town of Alstead. The projects reconstruct NH 123A adjacent to the Cold River and Vilas Pool Dam to

repair damage resulting from 2021 storm events, which overtopped the Vilas Pool Dam and severely eroded

NH 123A.

While advertised as a single construction contract, there are two projects for Federal Emergency

Management Agency (FEMA) administration purposes. The 43566A project extends from the southerly

project limits to the Vilas Pool Dam parking area, and the 43566B project covers from there to the northerly

project limits.

FEDERAL FUNDING: 90% (FEMA Public Assistance Funds) w/ 10% Non-participating State (Betterment)

match.

CONTINGENCY: The proposed contingency is 10% of the contract amount. This is to account for the risks

associated with the large quantity of rock excavation and construction restrictions from project agreements

such as limited roadway closure window and maintaining access to the Vilas Pool Dam.

PROJECT INITIATED: Permanent repair response due to damage to the roadway during the July 29-30, 2021

storm event, as noted in Description.

PROJECT EXPLANATION: This section of NH 123A adjacent to the Vilas Pool Dam has a history of flood

damage resulting from insufficient dam spillway capacity during extreme storm events. The alternate

spillway is NH 123A with the Cold River overwhelming ditch lines and eroding pavement and embankments.

The Department successfully applied for FEMA Project Assistance Program mitigation funding by

demonstrating a retaining wall will incorporate resilience to withstand high-flow conditions and reduce the

risk of future damage. The retaining wall stabilizes the embankment that supports NH-123A along the Cold

River east bank, thereby protecting the roadway from erosion, undermining and potential failure during

future flood events. Additional drainage, grading and rock removal adjacent to the dam, and permanent

erosion control improvements are proposed to divert away from NH 123A during flooding events. In

addition to other ancillary improvements, the roadway shoulder width and cross slope in the area of the new

retaining wall has been designed to accommodate pedestrian and bicycle traffic.

TRAFFIC IMPLICATION: The project includes the closure of NH 123A and a full signed detour of the project

area. The detour duration is for up to a 50-calendar day period, between the period of June 19

th, 2026

through August 14th, 2026. Detour signing will be set up prior to closure as laid out in the Plans. Notification

requirements prior to detour implementation can be found in the Proposal.

The project will use two-way alternating one-lane traffic patterns to re-open NH 123A to a single lane of

traffic facilitated by signage. This traffic pattern will also be used for short-term construction operations.

FINAL COMPLETION DATE: November 20, 2026.